ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
Recent Posts
Windows 10, who's upgraded?
by geoff in UK. 05/29/17 01:05 PM
How do you find a good employee?
by ElectricianBud. 05/27/17 10:58 AM
Recall notice: Bosch Solar panels
by ElectricianBud. 05/27/17 10:53 AM
Correct rotation, wrong sequence
by Potseal. 05/27/17 12:15 AM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
237,002 Are you busy
172,019 Re: Forum
164,896 Need opinion
Who's Online Now
0 registered members (), 43 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#80072 - 02/19/02 03:52 PM Generator connection  
smurrell  Offline
Junior Member
Joined: Feb 2002
Posts: 1
What code in NEC covers adding a generator receptical to a pump control panel, where the main power source is from the pole (the generator is backup)? Does the generator need a transfer switch to prevent accidental shorting to the pole power per the code?


2017 / 2014 NEC & Related Books and Study Guides

#80073 - 02/19/02 04:49 PM Re: Generator connection  
Tom  Offline
Member
Joined: Jan 2001
Posts: 1,044
Shinnston, WV USA
Try Article 702 Optional Standby Systems. You will need some type of transfer equipment.

Also, every electric utility that I've ever dealt with has a requirement regarding this. It would be best if you checked with them to see what their requirements are.

Tom


Few things are harder to put up with than the annoyance of a good example.

#80074 - 03/02/02 01:05 PM Re: Generator connection  
tdhorne  Offline
Member
Joined: Mar 2001
Posts: 345
Maryland, USA
The cheapest way out is to connect the pump controller to the service by cord and plug. This will allow you to just plug it into the cord from the generator.


Tom Horne

"This alternating current stuff is just a fad. It is much too dangerous for general use" Thomas Alva Edison

#80075 - 03/03/02 08:47 PM Re: Generator connection  
circuit man  Offline
Member
Joined: Nov 2001
Posts: 273
saluda,s.c.
all cases say that you should have a double pole double throw switch or an automatic transfer switch. this is to protect power line personel from back feed. which you most likely well be held accountable for. again check with the power supplier.ERWIN



Member Spotlight
noderaser
noderaser
Portland, Oregon, United States
Posts: 404
Joined: March 2007
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.003s) Memory: 0.7596 MB (Peak: 0.8899 MB) Zlib enabled. Server Time: 2017-05-30 09:07:39 UTC