Question on power to 4 Nema 6-50 & 5 Nema 5-15.
by TrickedoutTech. 10/22/17 11:36 PM
VFD MotorFeeders
by Yoopersup. 10/22/17 07:52 PM
Generator Cable Sizing
by brsele. 10/18/17 07:39 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,460 Are you busy
177,455 Re: Forum
169,027 Need opinion
Who's Online Now
1 registered members (gfretwell), 44 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#79073 - 11/26/01 09:36 PM Disconnecting Means vs Lock out  
DUBLIN  Offline
Member
Joined: Sep 2001
Posts: 19
Menasha, WI, USA
In a residentual single family dwelling with a (whirlpool/shower/steamroom) enclosure,this is a single combination use module. The whirlpool portion is supplyed by 2 20amp GFCI circuits (both circuits controlled by dead front GFCI devices located near the tub inclosure, the load side being terminated in single 20 amp recepticals to be cord connected to each the pump and inline heater).The steam generator is located in the basement 15 feet from the main service panel (within direct site), this is a 2 pole 20 amp circuit. The steam generator has a built in GFCI control (first one i've ever seen). The question is...Is it permissible to install merely a breaker Lock or would one need to adhear to the code more rigidly and install a disconnecting means(other than the breaker itself)?


| )ubli| |

2017 / 2014 NEC & Related Books and Study Guides

#79074 - 11/26/01 11:00 PM Re: Disconnecting Means vs Lock out  
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
For which component?


#79075 - 11/27/01 07:03 AM Re: Disconnecting Means vs Lock out  
DUBLIN  Offline
Member
Joined: Sep 2001
Posts: 19
Menasha, WI, USA
the steam generator, the whirlpool portion has already met code requirements.


| )ubli| |

#79076 - 11/27/01 10:05 AM Re: Disconnecting Means vs Lock out  
ElectricAL  Offline
Member
Joined: Oct 2001
Posts: 597
Minneapolis, MN USA
A Breaker Handle Lock would seem to be the minimum to get by.

With a 15 foot separation in the basement between steam generator and breaker, I wonder what the long term possibility is for a partition wall being built that breaks line of sight?

Setting a double pole 20 A snap switch at the steam generator would probably be a more conservative approach.

Al


Al Hildenbrand

#79077 - 11/27/01 02:48 PM Re: Disconnecting Means vs Lock out  
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,878
NY, USA
Dublin,

Hello, Welcome to ECN
Wouldn't the situation that you already have be code compliant?

Bill


#79078 - 11/27/01 06:10 PM Re: Disconnecting Means vs Lock out  
ElectricAL  Offline
Member
Joined: Oct 2001
Posts: 597
Minneapolis, MN USA
Whoops!

That was a red monkey (don't think of one!).

Dublin. . .the steam generator is probably only resistive heating of a vessel, no motor, so no local in sight disconnect is required. The branch circuit over current protective device is all the disconnect needed.

Coffee, please. [Linked Image]


Al Hildenbrand

#79079 - 11/27/01 10:55 PM Re: Disconnecting Means vs Lock out  
DUBLIN  Offline
Member
Joined: Sep 2001
Posts: 19
Menasha, WI, USA
Thanks ElectricAl kinda the direction I wasleaning towards. The local informed the contractor that he believed the steam generator would require a disconnect, I wasn't able to confirm a definate code requirement so was about to suggest to the local to allow a breaker lock as this is a common practice in the area for (Well pumps,Ovens and cooktops{not cord and plug connected},subpanels in other areas of the home, and other hardwired appliances and motor loads). I've always felt the ability to lockout such items puts everyone in a much safer working inviroment.

Thanks All for the welcome.


| )ubli| |


Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,262
Joined: December 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.018s Queries: 14 (0.003s) Memory: 0.7840 MB (Peak: 0.9363 MB) Zlib enabled. Server Time: 2017-10-23 17:22:39 UTC