ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by SteveFehr. 07/23/17 09:46 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,260 Are you busy
174,689 Re: Forum
167,090 Need opinion
Who's Online Now
0 registered members (), 62 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#74666 - 01/30/07 09:24 PM Cutler Hammer Add a Lug  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
I normally use Cutler Hammer meter combo load centers, both the wide body 40/40 (MBE4040B200BT) and the narrow 20/40 (MBE2040B200BT). There is an add a lug kit that will fit the 20/40 just fine, so you can put up to a 4/0 on the neutral lug, but it will not fit the 40/40, as the neutral bars are different. My supply house couldn't help me, they said there isn't one available to fit the 40/40. Now the funny thing is, there is a 200 amp breaker available for the 40/40, that only fits the 40/40 since it takes up four spaces, two across. So I can put in a 200 amp subfeed, except for the neutral.

Has anyone run into this, or have a solution? Yes I have an assortment of lugs and I can probably make one to fit, but I don't like doing this, besides there are at least two inspectors I know of that would fail it if they saw it was a "field fabricated" part.


Work Gear for Electricians and the Trades

#74667 - 01/30/07 11:56 PM Re: Cutler Hammer Add a Lug  
livetoride  Offline
Member
Joined: Jan 2005
Posts: 109
san diego ca usa
Yep had this problem thank god it was a t&m job and we could change to sq D.On the customer nickle. Rod


#74668 - 01/31/07 02:20 AM Re: Cutler Hammer Add a Lug  
stevecheyenne  Offline
Member
Joined: Nov 2006
Posts: 38
Yorba Linda, CA
Cutler Hammer has been very good about working with me when I have had problems. I'd give them a call and ask them what to do.

Go through your supply house to get the name and phone number of the local rep, or call the factory in Ontario, CA. The number I have for the factory is several years old but worth a shot - 909-923-2040. The other number I have is the district center in Mira Loma, CA 951-361-2040.

I'll bet they have something to do what you need to do.


#74669 - 01/31/07 05:47 PM Re: Cutler Hammer Add a Lug  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
THESE are a little bit pricey and require a crimper, but will suit your need.
I've had troubles with finding field installable modifications to C-H bolt in panels in the past (although the shop I worked at was right next door to the Mira Loma facility, and I could just walk across the parking lot).

C-H is absolutely great in this respect with larger switchgear, though.


#74670 - 01/31/07 10:47 PM Re: Cutler Hammer Add a Lug  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
Well Steve thanks, that is exactly what I did. I got through at their 800 number I got off their site. Turns out they have a lug, it is a NL300 and will accept up to 300KCMIL. We will see when it gets here in five days, if it fits.

electure, I'd be interested in seeing that product, but I couldn't get the link to open.



Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,260
Joined: December 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 14 (0.003s) Memory: 0.7683 MB (Peak: 0.9053 MB) Zlib enabled. Server Time: 2017-07-24 00:53:28 UTC