ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,863 Are you busy
169,656 Re: Forum
162,898 Need opinion
Who's Online Now
0 registered members (), 46 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#713 - 03/01/01 05:55 PM transfer switches and a generator  
sam  Offline
Member
Joined: Jan 2001
Posts: 29
where can i find information on installing a transfer switch and backup generator? we now have a battery backup system but am looking for alternate or a better system . any information will be helpful. Sam


Work Gear for Electricians and the Trades

#714 - 03/01/01 07:22 PM Re: transfer switches and a generator  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,306
sam;
I've got a lot of generator/t-switch links, they are easy to find. One item i have on order ( and have high hopes for) is a generator/t-switch standard. This can be found at
[url=http://www.neca-neis.org/]



[This message has been edited by sparky (edited 03-01-2001).]


#715 - 03/01/01 07:25 PM Re: transfer switches and a generator  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,306
one for the gipper;

infopop.com

[This message has been edited by sparky (edited 03-01-2001).]


#716 - 03/09/01 07:44 AM Re: transfer switches and a generator  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,306
NECA-EGSA 404-2000, Installing Generator sets

13 pages of contents as follows;

Lifting & moving gen-sets
lifting points
four point lift method
lifting gen-sets equipped with accessories

Generator Set installation procedures
location
mounting
electrical connections
exhaust system
fuel supply
air requirements
clean-up
punchlist
spare parts

Energizing and testing the gen-set
pre-energizing procedures
starting engine for the first time
performance testing
acceptance testing

Annex A; Reference standards

[Linked Image]



Member Spotlight
HotLine1
HotLine1
Brick, NJ USA
Posts: 6,809
Joined: April 2002
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.002s) Memory: 0.7589 MB (Peak: 0.8888 MB) Zlib enabled. Server Time: 2017-04-28 10:20:47 UTC