ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,332 Are you busy
174,803 Re: Forum
167,182 Need opinion
Who's Online Now
0 registered members (), 64 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#6544 - 01/05/02 02:10 PM light circuit loads  
Elzappr  Offline
Member
Joined: Dec 2001
Posts: 270
Oregon
Design-build has been a great way to speed up a construction project, and also quite an initial cost saving to the owner because of the "value engineering". My concern is about the long term cost. For example: Regular engineered jobs for commercial buildings frequently design a 20A illumination circuit with just 8A initial installed load. The jobs where the electrical contractor draftsmen/electrician/estimator design the illumination circuits commonly run about 14A initial installed load. As a result, the initial cost is driven down because you don't have as many circuits to deal with..but think of the expensive headaches down the line when remodeling is done and there isn't sufficient capacity or flexibility! I'm of the opinion that design-build by non-engineering staff among electrical contractors is moreoften short-sighted and not in the best interest of the building owners.
My question is primarily directed towards the engineers out there: What criteria do you use in your designs that you don't see applied by the electrical contractors? I'm thinking that there must be some laundry list of complaints against the quick-fix mentality and the long-term utility concerns of the professional engineer.

[This message has been edited by Elzappr (edited 01-05-2002).]


Work Gear for Electricians and the Trades

#6545 - 01/05/02 04:39 PM Re: light circuit loads  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
Elzappr;
Most tradesmen being exposed to engineered documents will find your Q self explanatary.



Member Spotlight
Joe Tedesco
Joe Tedesco
Boston, Massachusetts USA
Posts: 2,749
Joined: October 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.003s) Memory: 0.7434 MB (Peak: 0.8572 MB) Zlib enabled. Server Time: 2017-07-25 22:31:44 UTC