ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/18/18 10:41 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
VDE 0100 to introduce AFCIs
by LongRunner. 01/17/18 10:32 AM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 9 guests, and 15 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
light circuit loads #6544
01/05/02 01:10 PM
01/05/02 01:10 PM
E
Elzappr  Offline OP
Member
Joined: Dec 2001
Posts: 270
Oregon
Design-build has been a great way to speed up a construction project, and also quite an initial cost saving to the owner because of the "value engineering". My concern is about the long term cost. For example: Regular engineered jobs for commercial buildings frequently design a 20A illumination circuit with just 8A initial installed load. The jobs where the electrical contractor draftsmen/electrician/estimator design the illumination circuits commonly run about 14A initial installed load. As a result, the initial cost is driven down because you don't have as many circuits to deal with..but think of the expensive headaches down the line when remodeling is done and there isn't sufficient capacity or flexibility! I'm of the opinion that design-build by non-engineering staff among electrical contractors is moreoften short-sighted and not in the best interest of the building owners.
My question is primarily directed towards the engineers out there: What criteria do you use in your designs that you don't see applied by the electrical contractors? I'm thinking that there must be some laundry list of complaints against the quick-fix mentality and the long-term utility concerns of the professional engineer.

[This message has been edited by Elzappr (edited 01-05-2002).]

Work Gear for Electricians and the Trades
Re: light circuit loads #6545
01/05/02 03:39 PM
01/05/02 03:39 PM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,342
Elzappr;
Most tradesmen being exposed to engineered documents will find your Q self explanatary.


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Bill Addiss
Bill Addiss
NY, USA
Posts: 3,890
Joined: October 2000
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 18
Potseal 14
Popular Topics(Views)
243,544 Are you busy
180,351 Re: Forum
170,832 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.015s Queries: 14 (0.004s) Memory: 0.9412 MB (Peak: 1.0567 MB) Zlib enabled. Server Time: 2018-01-19 07:34:56 UTC