ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
VFD MotorFeeders
by gfretwell. 10/17/17 10:01 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
Generator Cable Sizing
by HotLine1. 10/16/17 07:13 PM
Another generator question
by HotLine1. 10/16/17 07:02 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,352 Are you busy
177,303 Re: Forum
168,928 Need opinion
Who's Online Now
0 registered members (), 39 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#5985 - 12/18/01 08:41 PM Pipew and elevator power  
Mike Shn  Offline
Member
Joined: Jun 2001
Posts: 25
New York
Hello
On Sunday I was working in basement(electrical room) in the new building. I'm helper in (NYC). I don't understand why power from electrician room(main room) to elevator goes on pipes(inside riser)... Why not just riser? Is it a big deal?


Work Gear for Electricians and the Trades

#5986 - 12/19/01 09:56 AM Re: Pipew and elevator power  
WARREN1  Offline
Member
Joined: May 2001
Posts: 176
Greenville, SC, USA
Mike
You may have to give us a little more picture here. Are talking about the building main electrical room or the elevator equipment room? Is the room on a lower basement level or at the roof level? Some elevator equipment rooms are at the bottom of the lift, and some are at the top. The NEC has several requirements for elevators, see Art. 620.


#5987 - 12/19/01 10:32 PM Re: Pipew and elevator power  
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,708
Anaheim, CA. USA
When you mention Risers, is this Bus Duct [Busway]?
Bus Duct / Busway will have Vertical enclosures running though the floors, and have Breakers Tapped off it at each Floor's Electrical Room.

If this is what you are referring to, then the most likely reasons for the Elevator Equipment being Piped are:

1: Elevator Equipment is in a location that's much easier to service from direct Pipe Runs,

2: Elevator Equipment incorporates a Standby Generator / UPS

3: Bus Duct feeding per floor user end equipment should be separated from the Elevator Equipment's Power Circuits and other heavy loads-such as HVAC, in order to lesson the problems of Power Quality for the Tenants.

Let us know if this makes sense!

Scott SET..


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!


Member Spotlight
Posts: 165
Joined: March 2007
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.002s) Memory: 0.7520 MB (Peak: 0.8741 MB) Zlib enabled. Server Time: 2017-10-18 05:33:19 UTC