ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
1913 American Electrician's Handbook
by annemarie1. 07/27/17 03:10 PM
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
Housebilding DIY wiring
Popular Topics(Views)
239,403 Are you busy
174,862 Re: Forum
167,238 Need opinion
Who's Online Now
0 registered members (), 67 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#5685 - 12/01/01 10:27 PM services  
mar1961  Offline
Junior Member
Joined: Nov 2001
Posts: 2
Wheeling,WV,USA
I just bought a very old house that had recently been rewired into three diferent apartments . My wife and I decided to make it into one house again my problem is I have three diferent pannels , three different meter-cans, and three different electric bills.
My question is what is the most economical way to make it just one service?


Work Gear for Electricians and the Trades

#5686 - 12/02/01 10:09 AM Re: services  
ken m  Offline
Member
Joined: Aug 2001
Posts: 58
south carolina
if it is not too much of a problem paying 3 different bills that would be the less expensive way out. otherwise you would have to, depending on your location, remove the 3 meter bases and install 1 meterbase\breaker combo with at least 6 bkr spaces and feed the 3 separate bkr panels from there. that is if the feeders are long enough. if not the cost just keeps rising. if your wanting to consolidate the 3 bkr panels into 1 then your looking at some serious re-wiring.
hope some of this helps. ken m


#5687 - 12/02/01 05:10 PM Re: services  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
To meet Code you will not be able to keep 3 meters in 1 occupancy per 230-40. 1 occupancy=1 meter. (Sorry)
I think the least expensive code compliant option you have is to sub-feed the 2 other panels from your main service panel, which will need to be sized to the entire load of your house.
You'll also have to abandon the 2 extra service grounds.


[This message has been edited by electure (edited 12-02-2001).]



Member Spotlight
waymag
waymag
dallas, texas, USA
Posts: 67
Joined: January 2002
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.002s) Memory: 0.7516 MB (Peak: 0.8763 MB) Zlib enabled. Server Time: 2017-07-29 11:43:30 UTC