ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
What do you do?
by ghost307. 09/22/17 08:26 AM
Another generator question
by gfretwell. 09/21/17 02:41 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
Linear Power Supply Quits Under Load
by JoeTestingEngr. 09/15/17 11:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,878 Are you busy
176,631 Re: Forum
168,540 Need opinion
Who's Online Now
0 registered members (), 47 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#52124 - 05/19/05 10:19 PM Underground Service  
GovtVoltage  Offline
Member
Joined: Apr 2003
Posts: 20
Sudbury,MA
Is there a requirement of a base for the PVC conduit to lay on in a underground service????> This base being sand or such?


Work Gear for Electricians and the Trades

#52125 - 05/20/05 01:19 AM Re: Underground Service  
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Not nessarily a code thing, but may be required by your POCO spec's.


Mark Heller
"Well - I oughta....." -Jackie Gleason

#52126 - 05/20/05 01:20 AM Re: Underground Service  
mhulbert  Offline
Member
Joined: Oct 2004
Posts: 132
Anaheim, CA USA
300.5 (F) requires "granular or selected material" (ie sand) if the fill contains rocks, paving chunks, etc.

On top of all that, many utilities require sand around the conduit. I know that PG&E here in CA requires 4" of fill that has all rocks under 1/2" dia. Their crews use sand for any work that they do.


#52127 - 05/20/05 07:56 AM Re: Underground Service  
dmattox  Offline
Member
Joined: Oct 2004
Posts: 265
Anaheim, CA
Socal Edison requires sand for one conduit. Two conduits are to be partially encased, conduits laying on sand, concrete poured on top of them. 3-4 conduits are to be fully encased, concrete all around them.

I forget when you need to start seperating them, but I know if you have 8 conduits you have to split them into seperate trenches.


#52128 - 05/23/05 01:41 AM Re: Underground Service  
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,707
Anaheim, CA. USA
Ditto on checking with the PoCo!

Also, are you referring to "Cushions" used on Primary Feeder Ducts?

SCE (So. Cal. Edison) wanted Sand and Gravel Cushions on Primary Feeders - especially when Feeders came from Poles on Hills.

SCE did not require anything special for Secondary Feeders, unless the Soil is very "Rocky", then they want some Sand.

I have the currently used "ESR" Manual from SCE (Electrical Service Requirements Manual), which I use for assistance in designs/engineering projects. If needed, let me know some specifics and I can reply with quotes from the ESR.
Although it may not be exactly what your PoCo would specify, it might be somewhat relavent - just for an idea.

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

#52129 - 05/23/05 01:52 AM Re: Underground Service  
dmattox  Offline
Member
Joined: Oct 2004
Posts: 265
Anaheim, CA
Quote
SCE did not require anything special for Secondary Feeders, unless the Soil is very "Rocky", then they want some Sand.


Scott35, in all the work we have done for Edison the secondaries have the same requirements as primaries. This usually means more work on the secondaries on our projects since there are usually multiple conduits which require encasement. While the primary usually is a single conduit requiring just sand.


#52130 - 05/23/05 06:30 PM Re: Underground Service  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
This post made me laugh, a feeder trench for a local auto dealer, was held up for days, because the utility inspector din't like the color of the sand, the engineer on the job was talking to himself.



Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,261
Joined: December 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 14 (0.003s) Memory: 0.7847 MB (Peak: 0.9354 MB) Zlib enabled. Server Time: 2017-09-23 02:07:15 UTC