ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
Another generator question
by gfretwell. 09/21/17 02:41 PM
What do you do?
by gfretwell. 09/21/17 02:33 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
Linear Power Supply Quits Under Load
by JoeTestingEngr. 09/15/17 11:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,856 Are you busy
176,612 Re: Forum
168,528 Need opinion
Who's Online Now
2 registered members (gfretwell, cableguy619), 42 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#47597 - 01/19/05 07:01 PM Strange happenings  
frank  Offline
Member
Joined: May 2001
Posts: 376
windsor ontario canada
We have two 600 kw Detroit generators with asco t switches.During our monthly load test on occasion the 800 amp main breaker will trip.This only happens on the transfer back to standard power.It's a known fact that the asco's switch too fast resulting in a short.The generators can be anywhere from 0 to 180 degrees out of phase with the utility.The building motors basically dynamically break and feed back into the busses as they spin down.Other strange things have started to happen as well.For instance in one area of the building up to 50% of the electronic ballasts in the fluorescent lights will fail and have to be replaced.I would think that this is due to either the basic input rating or the K rating the xformer that services that particular area.Has anyone seen this before?It's a new system and the electrical engineers have been out twice in the last year to monitor and solve the problem to no avail.Why not install an in phase monitor to delay the transfer?That breakers going to fail sooner or later at this rate.


Work Gear for Electricians and the Trades

#47598 - 01/19/05 07:34 PM Re: Strange happenings  
Roger  Offline
Member
Joined: May 2002
Posts: 1,716
N.C.
Frank,
Quote
Why not install an in phase monitor to delay the transfer?That breakers going to fail sooner or later at this rate.
this was my question reading your post until I got to the bottom and saw you are questioning it too.

What is their reluctance to do this?

I have been through the exact same thing (not the electronic ballast part) and it was solved with the In Phase Monitors.

Roger


#47599 - 01/20/05 09:20 AM Re: Strange happenings  
GamecockEE  Offline
Member
Joined: Jul 2004
Posts: 49
Georgetown, SC 29440
Frank, just so I can picture what is happening, are the generators suppose to be in sync with the utility prior to the transfer switch opening. Or do the generators shut down prior to the transfer switch moving back into the utility supply condition. In other words is there suppose to be a blackout prior to the return of utility power? Just trying to learn.


#47600 - 01/20/05 10:38 AM Re: Strange happenings  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
 
Foe decades, Asco has offered a synchronized-transfer {pseudo-25 device} option for their UL1008 electrically operated switches, but the feature has to be specified in the original purchase order.


#47601 - 01/21/05 12:29 AM Re: Strange happenings  
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Ok, let me get this straight. Utility, and the gennies are NOT ever linked, but the out of phase load inertia as you go back to the utility trips the breaker? Sounds like some massive motor loads? Darn straight the breaker might not survive the next time you do it. Can't be good for the motors, or anything else either.


Mark Heller
"Well - I oughta....." -Jackie Gleason


Member Spotlight
lil suzi
lil suzi
Midwest
Posts: 57
Joined: August 2003
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 14 (0.003s) Memory: 0.7688 MB (Peak: 0.9084 MB) Zlib enabled. Server Time: 2017-09-22 02:32:42 UTC