ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
VFD MotorFeeders
by gfretwell. 10/17/17 10:01 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
Generator Cable Sizing
by HotLine1. 10/16/17 07:13 PM
Another generator question
by HotLine1. 10/16/17 07:02 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,352 Are you busy
177,303 Re: Forum
168,928 Need opinion
Who's Online Now
0 registered members (), 39 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#45238 - 11/21/04 09:16 PM Don't forget to get permits!  
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA


Work Gear for Electricians and the Trades

#45239 - 11/21/04 10:21 PM Re: Don't forget to get permits!  
harold endean  Offline
Member
Joined: Feb 2002
Posts: 2,233
Boonton, NJ
Not for nothing but the fine in NJ just went up from $500 to $2000. The Dept. of Community Affairs (DCA) thought that $500 was too little. They figured that a $2000 hit in your pocket book might make you take out a permit the next time you have too. Just a little reminder for the NJ people out there.


#45240 - 11/21/04 11:57 PM Re: Don't forget to get permits!  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
It's not just the fines, or loss of lic. what if there is no permit, and a loss takes place, are you ready to pay a large loss that, the insurer will not cover, because work was not permitted or face criminal charges.
Ya, we all know, it's just a little job, or only one outlet, but that little job, one outlet can determine your future, if all goes wrong.


#45241 - 11/22/04 12:20 AM Re: Don't forget to get permits!  
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
SF is 10X's permit cost per trade per day. Pity those who get bust on friday, or a long week-end, then if you can't qualify for permit, like you dont have a licence... $10,000, and call the license board for you.

Average permit cost varies from $100 - $400 on resi, $100 -several thousand on Comm. done by sq/ft.

My favorite is the giant red door seal, and locks, and a sign that says removing tools or material is a felony.

[This message has been edited by e57 (edited 11-21-2004).]


Mark Heller
"Well - I oughta....." -Jackie Gleason

#45242 - 11/22/04 06:52 PM Re: Don't forget to get permits!  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,872
Brick, NJ USA
Ouch!!!
And people say NJ is "TOUGH".
That makes the $2k look like a business exspense!!

John


John

#45243 - 11/23/04 04:51 AM Re: Don't forget to get permits!  
coachman  Offline
Member
Joined: Dec 2001
Posts: 15
Cherry Hill, NJ, USA
harold endean

Where can I find more info on the fines in NJ?

regards,
Jim


#45244 - 11/23/04 12:53 PM Re: Don't forget to get permits!  
sparky66wv  Offline
Member
Joined: Nov 2000
Posts: 2,236
West Virginia
When I vowed to never work in Lewisburg again, I had it out with the Inspector there, seems anything above a lamp change requires a permit. Pulling a permit requires submitting a drawing. I think there's some rule somewhere saying that only architects and draftsmen are allowed to do the drawings and engineers need to be called in to make sure it is right. Everyone stamps it, and you're not allowed to make copies.

At my last estimate, a switch-change (we're talking resi 15A single pole here) would be about a $1000 job before you ever got the cover off.

Like I told the inspector, some rules will only insure that qualified people won't touch it with a ten-foot pole.

Why? Mr. Handyman across the street can change that switch for a sandwich and a cup of coffee... why would they want to do it "right"?

Stupid...


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

#45245 - 11/23/04 11:06 PM Re: Don't forget to get permits!  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,872
Brick, NJ USA
Coachman:

First, welcome to the forum from another NJ guy.

I can give you the following NJ info, as I'm in NJ also.

The State Uniform Construction Code (NJUCC), 5:23 et al sets the standards for fines. As Harold said the $500 max was increased to $2000, and yes, I have written a few $2k Notices of Violation.

It's not something that I like to do, but the last guy acted like "oh well" as he came in and wrote the check.

Enforcement is up to the AHJ's and the Construction Official (CO), and remember the $2k is MAXIMUM.

If you need or want specifics, e-mail me or Harold. You can get a UCC (Blue Book) from Trenton, and if you do, subscribe to the update service, as there are constant changes.

BTW, if you're looking for good reading materials, the UCC is NOT it....it's a LAW book, and a lot is written in legaleese.

John


John

#45246 - 11/23/04 11:36 PM Re: Don't forget to get permits!  
wewire2  Offline
Member
Joined: Nov 2002
Posts: 244
California
What if your proposal states "permits not included" to the owner or General Contractor.
Would you still be liable because they failed to get a permit? Opinions?


#45247 - 11/24/04 05:03 PM Re: Don't forget to get permits!  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,872
Brick, NJ USA
Wewire2:
It isa the Lic EC's responsibility to apply for and obtain the Electrical Permit here in NJ.

The EC's is also RESPONSIBLE to obtain any and ALL required inspections.

NJ 5:23 also states wording to the effect that "FINAL payment shall NOT be made until all inspections and APPROVALS are obtained"
Those are not the exact words, but that's the drift.

A good line within a Proposal is "permit fees are NOT included in Proposal Total Costs; permit fees will be invoiced at 'cost' and a copy provided"

John


John


Member Spotlight
Posts: 165
Joined: March 2007
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.020s Queries: 14 (0.003s) Memory: 0.8100 MB (Peak: 0.9848 MB) Zlib enabled. Server Time: 2017-10-18 05:35:31 UTC