Question on power to 4 Nema 6-50 & 5 Nema 5-15.
by TrickedoutTech. 10/22/17 11:36 PM
VFD MotorFeeders
by Yoopersup. 10/22/17 07:52 PM
Generator Cable Sizing
by brsele. 10/18/17 07:39 PM
What do you do?
by gfretwell. 10/17/17 01:08 AM
Good ol' copper pipe in the fuse holder trick
by HotLine1. 10/16/17 07:16 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
241,460 Are you busy
177,455 Re: Forum
169,027 Need opinion
Who's Online Now
1 registered members (gfretwell), 44 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#45030 - 11/17/04 08:41 PM Help With Proposal  
mustangelectric  Offline
Member
Joined: Feb 2004
Posts: 494
Bentonville, AR
Hi,
I am making a proposal on a 110 unit duplex project and wanted to see if I could get some feedback.

The units are 1100 SQF each, no meter, all electric. The units will each get a panel outside that is fed from a PDC. Each unit is geothermal.

The owner is supplying all material. I am just providing labor. 6 guys..3 j-men and three helpers.

What is the best way to bill and what is the best way to calculate hours spent on the job?

No permit required.

Thanks for any replies or suggestions.

-regards

Greg


Electricity has no respect for ignorance!

Work Gear for Electricians and the Trades

#45031 - 11/17/04 08:51 PM Re: Help With Proposal  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,458
NY, USA



Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,262
Joined: December 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 14 (0.003s) Memory: 0.7437 MB (Peak: 0.8628 MB) Zlib enabled. Server Time: 2017-10-23 17:23:06 UTC