ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
VDE 0100 to introduce AFCIs
by sparky. 01/16/18 06:36 PM
Air Compressor feeder conductor sizing
by Potseal. 01/15/18 09:08 PM
Under carpet cable?
by HotLine1. 01/15/18 09:57 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 7 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Code Cycle #4418
09/25/01 06:53 PM
09/25/01 06:53 PM
N
Nick  Offline OP
Member
Joined: Aug 2001
Posts: 599
Riverside, CA
Many municipalities around here are at least a code cycle behind in adopting the current NEC. My question is as follows.

When the more recent code becomes more stringent the city cannot enforce that code until they have adopted that edition, right? What about the flip side to that. If the current code relaxes a requirement and a contractor installs per this new not a stringent rule, does the city have to accept it even if they have not adopted that cycle? Or is it up to their discretion wether to accept it or not? Just curious what everyone's take is on this.

Work Gear for Electricians and the Trades
Re: Code Cycle #4419
09/25/01 07:14 PM
09/25/01 07:14 PM
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,888
NY, USA
Nick,

I think it is always up to their discretion.
Did you have something specific in mind?

Re: Code Cycle #4420
09/25/01 07:23 PM
09/25/01 07:23 PM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,342
My state will formally adopt the 2002 sometime around June, July. I guess the state inspectors need time to bone up on it.

Until such time, the 99' flys, warts & all.
A good case in point for 'relaxed' standards would be the ol' gas pipe bond
(heee-hawww mule bayin' )
[Linked Image] [Linked Image]

Re: Code Cycle #4421
09/25/01 09:07 PM
09/25/01 09:07 PM
N
Nick  Offline OP
Member
Joined: Aug 2001
Posts: 599
Riverside, CA
Nothing specific in mind. Just a general question. The last two juristictions I have worked in are still under the '96 code and here we are just getting 2002. [Linked Image]

Re: Code Cycle #4422
09/25/01 09:19 PM
09/25/01 09:19 PM
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,888
NY, USA
Maybe I haven't been paying attention, but I always thought that the Code acception was automatic and immediate around here (NY). Does anybody know?

You know, it's funny but all this global interaction here can really make someone have to rethink what they already "know" and stop taking everything for granted. Has anyone else noticed that?

Bill

Re: Code Cycle #4423
09/25/01 09:59 PM
09/25/01 09:59 PM
N
nesparky  Offline
Member
Joined: Jun 2001
Posts: 642
omaha,ne
Here the new code will be adopted somewhere around Jun - Aug. Untill then 1999 applies. After that most inspectors use the date you pulled the permit to rule on short term jobs. It can lead to a lot of discussion on longer term jobs. Usually what ever the inspector says will rule--not always depends on how far along the job is.


ed
Re: Code Cycle #4424
09/26/01 06:19 AM
09/26/01 06:19 AM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,263
Fullerton, CA USA
Learned this one early on:
I saw an old electrician scratching his head & kicking the ground in about '75. Seems he had put all his 4 wire homeruns in 1/2" EMT on the store he was building. Los Angeles County was still going by '68 Code's wirefill, which only allowed 3 #12 in a 1/2" conduit. (7 years later)
Yes, they made him tear it all out. Seems like inspectors reject change of any kind until they're forced to accept it.

Re: Code Cycle #4425
09/27/01 03:23 PM
09/27/01 03:23 PM
W
WARREN1  Offline
Member
Joined: May 2001
Posts: 176
Greenville, SC, USA
In my experience, I have seen some states that have an automatic acceptance of the NEC. I think South Carolina does. There are some municipalities that adopt the code, and have local ordinances that override some portions of the NEC. This usually occurs in areas pertaining to mobile homes, RV parks, etc., and are more stringent. I don't recall ever having the NEC relaxed.

Re: Code Cycle #4426
09/27/01 03:34 PM
09/27/01 03:34 PM
R
resqcapt19  Offline
Member
Joined: Nov 2000
Posts: 2,148
IL
Automatic acceptance of the new code is not legal. It is a law when adopted by a governmental unit and must be approved by the legislative unit of government in the same manner as any other law. The courts have ruled that laws must specifically state the edition of the code that is to be used. If the law would state "current edition", the edition that was available at the time that the law was passed would be the legal code forever, unless changed by the passage of a new law.
Don(resqcapt19)


Don(resqcapt19)
Re: Code Cycle #4427
09/27/01 06:36 PM
09/27/01 06:36 PM
P
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Hmm, interesting reading.

Are there any other examples of the current NEC (or local/state codes) being LESS stringent than in the past?

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,263
Joined: December 2000
Show All Member Profiles 
Top Posters(30 Days)
sparky 23
Admin 20
Potseal 13
Popular Topics(Views)
243,516 Are you busy
180,314 Re: Forum
170,811 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.032s Queries: 15 (0.005s) Memory: 1.0232 MB (Peak: 1.1997 MB) Zlib enabled. Server Time: 2018-01-17 09:20:03 UTC