ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Dimmable LED 2x4 lay in fixtures
by Potseal. 04/23/17 07:18 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
Electrode boilers question
by SteveFehr. 04/21/17 08:32 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,653 Are you busy
169,345 Re: Forum
162,685 Need opinion
Who's Online Now
0 registered members (), 81 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#42966 - 09/29/04 10:18 PM Log Home  
mustangelectric  Offline
Member
Joined: Feb 2004
Posts: 494
Bentonville, AR
Hi,
I looked at a job today that is a modern log home. it seems the builder installs the raceways and cuts the holes for the outlets etc.

this is a two single family home with a walkout basement. around 4000 sq ft total.

the service is located around 100 feet from the home.

i have done a few log homes but it was back in the early eighties and i can remember that there was a lot of drilling and boring and fishing cables and there was a lot of wiremold boxes installed on the suface of the logs.

these logs are cut at a mill and fit together with a tongue and groove type joint. the interior of the home is stud walls. i would probably use metal masonry boxes for the cut out holes...shallow and deep..this way the box can be secured in the wall..

i am thinking that this would be a little higher than a regular stick built home.

cable/data/tel extra..

about 10 recessed cans and 10 undercounter lighting (puck type)..ceiling fans in all rooms except bath and hallway.

total electric..

i was wondering if anyone had any experience on one and what one may suggest for a price per sq ft or opening.

i was thinking $8K for the job that would include a 200A service and no light fixtures.

thanks for any comments or suggestions.

sincerely,

mustang


Electricity has no respect for ignorance!

Work Gear for Electricians and the Trades

#42967 - 09/30/04 01:53 AM Re: Log Home  
sparkystudent  Offline
Member
Joined: Apr 2004
Posts: 42
Staples, MN. USA
Mustang give me an e mail and can discuss in fine detail as this is primarily what I (company i work for ) do. as for the rest of the readers we drill with a superhog and 4 foot lennox auger bits every 4th - 6th row of logs the boxes are set between courses of logs so the 3 and 4th row share a box we use t&b 2000 and screw them in the back have recently gone to the smart boxes on a trial basis (definately my preferance) all done in nm and it requitres planning in advace for the circuit layout especially if it is on a slab on grade. any one else have questions please feel free to ask, i dont usually have much to offer here but this one is a comfort zone [Linked Image]

[This message has been edited by sparkystudent (edited 09-30-2004).]


#42968 - 10/02/04 12:59 AM Re: Log Home  
Dallas  Offline
Member
Joined: Aug 2001
Posts: 151
North Salem, IN 46165
In the log homes we have done, we cut in receptacles in the large baseboard, positioning them so they fall in the inset between the first and second logs. then we jsut staple the NM to the logs, and let the trim guys cover it with the baseboard. The switches are mounted into the large area around the doors (for shrinkage in the logs) that gets covered with a wide plank.

Most of it is fairly normal NM wiring, with most of the prior planning going into lighting layout, and getting switch legs in place before the roof system/second floor is set in place.

I've never done a slab log home. THAT would be a bear.



Member Spotlight
Radar
Radar
Los Angeles, CA
Posts: 349
Joined: April 2004
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 14 (0.003s) Memory: 0.7514 MB (Peak: 0.8762 MB) Zlib enabled. Server Time: 2017-04-24 19:05:23 UTC