ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,330 Are you busy
174,797 Re: Forum
167,171 Need opinion
Who's Online Now
0 registered members (), 80 guests, and 14 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#36423 - 04/06/04 06:29 PM stub ups  
big guy  Offline
Member
Joined: Dec 2003
Posts: 59
pa
Dose anybody know where i can get sizes
for rigit pipe stub ups. From 2" to 5"
thanks alot big guy


Work Gear for Electricians and the Trades

#36424 - 04/06/04 07:06 PM Re: stub ups  
hbiss  Offline
Member
Joined: Dec 2003
Posts: 886
Hawthorne, NY USA
Are you looking for 90 deg elbows? Your supply house should handle at least through 4" and be able to order larger.

-Hal


#36425 - 04/06/04 08:30 PM Re: stub ups  
cavo148  Offline
Member
Joined: Jan 2004
Posts: 79
New Jersey
Hal is right about getting 90 degree sweeps, or manufactured 90's as some call them, from your supplier. If you want to save some money, down the road that is, next time you come across another EC with a hydraulic pipe bender make some sort of a deal with him. I'm sure he'll be happy to make a few extra bucks to cover the cost of his bender. At the very least, it'll be one less big coupling you have to buy.

Andy


#36426 - 04/10/04 12:23 PM Re: stub ups  
big guy  Offline
Member
Joined: Dec 2003
Posts: 59
pa
thanks i got it
we have some big benders that i use but thay
are not on my job.I have to put in pipes from one room to another.(under the slab) One room is 18" higher i can't have the bend
of the pipes stick out of the slab per spec.


#36427 - 04/11/04 08:02 PM Re: stub ups  
hbiss  Offline
Member
Joined: Dec 2003
Posts: 886
Hawthorne, NY USA
I assume the pour is not on grade where you could just trench deep enough so the bend will be below the finished floor. The way around this is to use two 45 deg bends, one horizontal and the other vertical. Align both so the stub up is plumb. Hopefully this will keep everything below.

-Hal



Member Spotlight
JoeKP
JoeKP
Berkley, MA
Posts: 144
Joined: March 2008
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.011s Queries: 14 (0.002s) Memory: 0.7664 MB (Peak: 0.9029 MB) Zlib enabled. Server Time: 2017-07-25 18:32:34 UTC