ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,229 Are you busy
174,628 Re: Forum
167,057 Need opinion
Who's Online Now
0 registered members (), 51 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#3240 - 08/13/01 07:22 AM Sympathy for the Devil  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
A single-family home does not need an inspection in my state. Add to this that 1/2 of what's up here are camps and trailers. I am always getting calls by weekend warriors who have done part of the job, and wish me to do the remainder. Many times , the part they have done is not up to code, and i have to be the bad guy and tell them i'd need to redo this or that. I have had to stand my ground under fire in said circumstances, and lost some jobs along the way not that i care about those losses. I do not wish to be liable for any DYI's boo-boo's, and my sympathy for such arrangements has grown thin over time. How should i mitigate these deals?
[Linked Image]


Work Gear for Electricians and the Trades

#3241 - 08/13/01 09:42 AM Re: Sympathy for the Devil  
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,878
NY, USA
Sparky,

I would say that you have to stand your ground. Try and come to an agreement on the phone before you go there. You have to protect yourself and will not continue work that you find is against code or unsafe. If something is wrong, will they let you fix it? If not, forget them.

I have a question.
Say an Electrician is called in to a situation where an area of the Structure was wired, or Re-wired and everything is closed up and finished except for the cables left dangling in front of the Panel. (They usually say that they are afraid of Electric or something similar ???) All he can do (within reason) is test the ends of the cable for shorts, do some spotchecks by removing covers, and a polarity check afterwards.

What is his Liability if he terminates the wires to breakers?

Bill


#3242 - 08/13/01 10:16 AM Re: Sympathy for the Devil  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
been there, done that, have'nt lost my T-shirt yet. i usually open up what i can for a look-see, but much is simply a 'gut' feeling as to how the 'installer' comes across to me.
would a bill w/disclaimer be appropriate?


#3243 - 08/13/01 10:22 AM Re: Sympathy for the Devil  
gpowellpec  Offline
Member
Joined: Dec 2000
Posts: 127
Irving, Tx USA
I always turned down these jobs over the phone. In my case it was usually necessary to pull a permit. I always said that since I or someone working for me did not install the wiring, I could not let my liability insurance stand for the work. If I billed only for the work I did and the house burned down due to a branch circuit I did not put in the insurance company would wonder how I wired a whole house or addition for the price I charged. They would probably smell something fishy and cancel me. If I was detailed on the invoice and excluded the other work, I may be still liable, without benefit of insuranc company assistance, because I was the only knowledgeable person involved.



Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.004s) Memory: 0.7605 MB (Peak: 0.8912 MB) Zlib enabled. Server Time: 2017-07-23 08:30:35 UTC