ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Admin 5
Recent Posts
Dimmable LED 2x4 lay in fixtures
by Potseal. 04/23/17 07:18 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
Electrode boilers question
by SteveFehr. 04/21/17 08:32 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,650 Are you busy
169,334 Re: Forum
162,672 Need opinion
Who's Online Now
0 registered members (), 68 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#30717 - 10/26/03 01:14 PM sizing nuetral for M.C.C.  
Tim Peters  Offline
Member
Joined: Mar 2003
Posts: 10
I have a MCC feeding a 600 amp 277/480 4 wire MCC. I'm using parallel 500mcm for the phases but there is no actuall load on the neutral so can I get away with no neutral? My concern is that the blue prints list it as 4 wire so do you think they want a neutral pulled for future use maybee?

Any info appreciated.


Work Gear for Electricians and the Trades

#30718 - 10/27/03 12:39 AM Re: sizing nuetral for M.C.C.  
nesparky  Offline
Member
Joined: Jun 2001
Posts: 642
omaha,ne
Tim
Where is this MCC getting it's control power from?
If the plans and specs call out 4 wire, I would install a full size neutral. You cannot know what is planned for the future unless all the MCC buckets are used now.


ed

#30719 - 10/27/03 06:32 AM Re: sizing nuetral for M.C.C.  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
If the plans called for a four wire feeder to this MCC and you bid it and won it with that requirement you should install it.

Putting aside that it is the right thing to do, if after you leave the job they need that neutral who do you think will pay for it to be installed?


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#30720 - 10/27/03 10:13 PM Re: sizing nuetral for M.C.C.  
Tim Peters  Offline
Member
Joined: Mar 2003
Posts: 10
One bucket of the mcc is feeding a transformer which in turn id feeding a 120/208 panel. This panel is feeding two controll panels for all my controll wiring.
Each bucket of the mcc has a TRF for the coils within it.

I did not bid the job but the nuetral was included in the bid so IMO it should be included but my superiors think different.

This post is mostly meant to justify my thinking, I wanted to make sure I wasnt missing something.


#30721 - 10/27/03 10:19 PM Re: sizing nuetral for M.C.C.  
Ryan_J  Offline
Moderator
Joined: Aug 2003
Posts: 1,374
West Jordan, Utah, USA
I would send an RFI to the engineer and get a CCD on paper to cover your back.


Ryan Jackson,
Salt Lake City

#30722 - 10/28/03 07:05 AM Re: sizing nuetral for M.C.C.  
zapped208  Offline
Member
Joined: Feb 2003
Posts: 196
Somewhere in USA
Tim,- Was an equip. gnd. pulled in?, since someone is trying to cut corners on your job?


Shoot first, apologize later.....maybe

#30723 - 10/28/03 05:36 PM Re: sizing nuetral for M.C.C.  
Tim Peters  Offline
Member
Joined: Mar 2003
Posts: 10
Yes a equipment ground will be pulled in


#30724 - 10/28/03 10:40 PM Re: sizing nuetral for M.C.C.  
Pinemarten  Offline
Member
Joined: Aug 2003
Posts: 123
Edmonton, AB, Canada
I feel it is up to the owner.
Now cost vs. later. Explain the cost at a later date.
If he wants to save money at this point, he may want to.
I also agree with paper from the engineer, CYA.



Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Featured: