ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
600 KW 120/208 3 Phase Y protection
by gfretwell. 07/20/17 01:02 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,168 Are you busy
174,557 Re: Forum
166,993 Need opinion
Who's Online Now
0 registered members (), 42 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#2697 - 07/20/01 08:43 PM Your best  
Tom  Offline
Member
Joined: Jan 2001
Posts: 1,044
Shinnston, WV USA
Well, we've all sat around in this forum & condemned the really poor work of all those jackleg electricians. Let's hear about the best job you ever did. it can be from any point of view from making a lot of money to how good it looked.

My personal best was 19,000 square feet of office/test facility for Mountaineer Gas in Charleston, WV. Job came in on time, on budget (my budget) & had a zero item punch list. The engineer from the gas company said "I tried hard to find something wrong, but I couldn't." To top it all off, the general contractor paid me on time.

Tom


Few things are harder to put up with than the annoyance of a good example.

Work Gear for Electricians and the Trades

#2698 - 07/20/01 09:35 PM Re: Your best  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
good idea Tom !

a service call.,,,midnight......

old MDP 480 3 ph down, approx size 8' high 6' wide 2' deep, many fusible disco's. this served a pasta factory, many 50HP motors that pumped anahydrous in the same room..

freezers as large as a 4 car garage full of product down, head maint man's head spinning, vice prez on the ph every 5 min for an update, anahyd amonia starting to leak into the MDP area as i was tearing it apart.

i found the flash-over point ,motor spikes probably jumped the bad connection , our eyes were watering from the amonia by then .

Sometimes your a hero or a zero, no inbettween.......... [Linked Image]

I've been getting "pig pasta" ever since

[Linked Image]


#2699 - 07/21/01 06:21 PM Re: Your best  
Fred  Offline
Member
Joined: Apr 2001
Posts: 449
Straughn, IN 47387
166,000 sq.ft. light manufacturing building. 368 400W MH light fixtures, 12,000 ft. 3/4 EMT, 16,000 ft. 1/2" EMT, 4500' 12-3 SOOW cord(pendants)150 miles #12 & #10 THHN, 6000' 500 MCM, 400 tons 480V A/C, 8 dry transformers(120/240 & 208/120)all done by 3 of us- ahead of schedule!


#2700 - 07/21/01 08:51 PM Re: Your best  
sparky66wv  Offline
Member
Joined: Nov 2000
Posts: 2,236
West Virginia
At a local Drive-In Restaurant..(remember those?)
Rebuilt 6 outdoor menu signs and ran new feeder to all signs and outline lighting... (started out as a "bulb change"...there were no ballasts in two of the signs and all of them had atrocious wiring...)
Rewired a Fryer (with 190ÂșC wire) and "repaired" the on/off switch (rotary type with points, which one side had failed to make contact...)
Replaced Switches for Exhaust Fan and Hood Lights, tightened up all three hood lights, a "completely dismantle to repair ordeal..."
Tightened up ceiling fan and replaced socket and globe, again it had to be dismantled first...
Replaced 250V A/C Receptacle.
Replaced 125V A/C Receptacle.
Replaced blacklight bulb and switch in bug zapper...
Tightened cord connector in marquis sign (not as easy as it sounded, had to dismantle almost the entire thing in this one too!)...
Didn't have to order a single part and fixed everything on the customer's list.

If I actually accomplish everything I have scheduled for the next two weeks I'll post the results and declare a miracle. Rough-in a 2600 sq ft house and wire a service and feeders for a music festival... Yes the nightmare came true and they both occurred in the same two week period... I was afraid of that.


[Linked Image]


[This message has been edited by sparky66wv (edited 07-21-2001).]


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

#2701 - 07/22/01 01:48 AM Re: Your best  
Jim W  Offline
Junior Member
Joined: Jul 2001
Posts: 7
New 3 phase 600 amp 208/120 service in an old brown-stone tv studio building, parallel feed to a beautiful 600 amp I line breaker panel 6' high by 4' wide. Stepped up to 480V by using transformers backwards for elevator and HVAC !. Put in many sub panels.
Wired elevator shaft, elevator control panel, hall switches and totally rewired old car. (Yes it works!)Learned all about knob & tube wiring, HAHAHA (:
Built 2 TV lighting grids (wish I new more at the time). And installed new digital phone system.


#2702 - 07/22/01 03:31 AM Re: Your best  
mickky  Offline
Member
Joined: Jul 2001
Posts: 43
toronto
As an informed and very interested DIY'er, I have been fascinated with the photos and posts placed in the forums here...it seems that basic common sense is sometimes a requirement that can be set aside for the sake of a few $. I have just been completing a rewire of a 100 year old brick house, and discovered five distinct generations of elec. renos-six oct. junction boxes in an unfinished basement with KT,, some old romex with paper filler, #12 UF, BX (Armored cable), and some new NMD90 sprouting octopus-like from each J-box.(!) (Made the job of tracing the circuits quite easy...)The house had 8 branch circuits originally, including elec. dryer and range (!)It now has 20.Incidentally, I have the common sense to leave the SE and panel install to the pros.(As is usually required.) Thought you might like to know.


#2703 - 07/23/01 02:19 AM Re: Your best  
ELECTRCTEX  Offline
Junior Member
Joined: Jul 2001
Posts: 1
Ft. Worth, Texas, U.S.A.
Has to be my last christmas shutdown project, when I still worked for the largest elec. contractor in the U.S., I ran an inhouse account at a near by smiconductor plant.
Had to replace old buss from detached u.p.s. bldng.whith 36" cbl. tray. Cbl. tray was 360' run, ranging from 15' above ground, to 40' above ground were it went into the plant,& held 10 armored cbls., each one w/4-750mcm & 3#4's. Cbl. was 12lbs per foot, making each spool about 5000lbs.
Set 2 new 5000a $gear at each end w/tie brkr.

Had a 18hr window (christmas day) to coordinate 27 men, do all the terminations & switch over to get plant back into production before Dec.26.

Everything went unbelievably well, switched over to new feeds, flipped tie brkrs (no explotions, allways kinda nervouse testing that two power source closed tie brkr. theory). Rapped up a $550,000.00 job, no one got hurt,& no production lost.

I would like to add this was only made possible by the best group of dedicated electritions a superintendant could ever ask for, I GIVE ALL THE CREDIT TO THEM.


#2704 - 07/23/01 08:06 AM Re: Your best  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
In '76, I rehabilitated an amusement park that had been shut down for 4 yrs.
There were tigers, giraffes, bears, etc. on site. We even used an elephant to tug some wire. I worked with the movie set folks and special effects guys building stages for the shows. Hot summer afternoons were spent repairing underwater lighting (hundreds of PAR56 in the old dolphin pools), pulling them out while wearing an air mask in the crystal clear water. The whole park was just full of pretty girls.

I've done lots of work since, some that went more smoothly, almost all making better money than this one did, but I've never had more fun than I did on this job.


#2705 - 07/23/01 08:29 PM Re: Your best  
sparky66wv  Offline
Member
Joined: Nov 2000
Posts: 2,236
West Virginia
Quote
I worked with the movie set folks and special effects guys building stages for the shows.


Ahhh...

You've done some "Best Boy" work I see!


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

#2706 - 07/24/01 12:28 AM Re: Your best  
gpowellpec  Offline
Member
Joined: Dec 2000
Posts: 127
Irving, Tx USA
Wouldn't Electure have been the Gaffer? Or maybe from his talk of fun, he was the Best Boy and his Gaffer had to do all the work.


Page 1 of 2 1 2

Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 216
Joined: March 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.017s Queries: 15 (0.003s) Memory: 0.8209 MB (Peak: 0.9969 MB) Zlib enabled. Server Time: 2017-07-20 22:48:29 UTC