ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by jwes2699. 01/21/18 05:58 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 15 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Just another day in California #25145
04/26/03 11:21 PM
04/26/03 11:21 PM
D
deenjiee  Offline OP
Junior Member
Joined: Apr 2003
Posts: 1
California
This is a humorous situation one faces living a day in the life of a California Electrician.

In lieu of the recent 16x16 addition on a residential project, the existing 100 amp meter/combo did not meet the required 36" of horizontal working space. As a result, the homeowner wanted to take the opportunity and upgrade to a 200 amp service and relocate it to the Northwest corner of the addition. The new upgraded service is about 18' away from the existing one that currently feeds the residence.

The installation is complete in order to energize and transfer the load from the existing to the new, so I thought.

The local authority came out, checked the work, but said I wasn't ready for him to "Release Power" since I hadn't energized the new service yet.

I was then instructed to cut the Service Laterals feeding the existing service - at the point of attachment and jumper them to the upgraded service 18' away. I also needed to jumper between the line side of the upgraded meter's vertical contacts to temporarily feed the service until the utility company can permanently install the meter. At one point I was told, once I cut the energized Service Laterals (from the Utility side) I could even "wrap" the conductors around the large tree branch nearby to relieve the triplex conductor's tension. And the conductors I was to use for this jumper could be left on the roof until everything was switched over.

Say..what?

Huh,

Don't worry - I've simplified the whole process with a few phone calls. Wouldn't you know that it may just be easier for the Utility company to move there own laterals, ONCE, rather than adding jumpers here and there to end up with the same result. Sometimes I worry - a lot about what goes on out there and is deemed acceptable.

That's my story for today, I'd be interested in hearing about some of the 'other' situations taking place out there.


Deenjiee
Work Gear for Electricians and the Trades
Re: Just another day in California #25146
04/27/03 07:44 AM
04/27/03 07:44 AM
T
txsparky  Offline
Member
Joined: May 2001
Posts: 552
Magnolia,.Texas U.S.A.
Wow ! As if having to deal with earthquakes,fires ,and mudslides wasn't enough. [Linked Image]


Donnie
Re: Just another day in California #25147
04/27/03 09:30 AM
04/27/03 09:30 AM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,264
Fullerton, CA USA
It sounds like your AHJ is off his/her rocker.
"Releasing Power" is generally an acknowledgement that the service is ready to be energized.
(I had an AHJ that wouldn't give us a final or release power until he saw "everything running". It was hard to convince him that the 277/480 3Ø system wouldn't work off of the 120/240 temp service. He made me rent a generator...and I'm still mad)...S


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,264
Joined: December 2000
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
sparky 16
Potseal 15
Popular Topics(Views)
243,587 Are you busy
180,382 Re: Forum
170,859 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.014s Queries: 14 (0.003s) Memory: 0.9512 MB (Peak: 1.0754 MB) Zlib enabled. Server Time: 2018-01-22 04:42:13 UTC