ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 3
Recent Posts
Nec circuit protection
by Yoopersup. 11/22/17 03:22 PM
FPE in Germany
by Texas_Ranger. 11/19/17 07:30 AM
Ceiling fan distance from outdoor hot tub
by gfretwell. 11/16/17 02:18 AM
diazed fuses
by Texas_Ranger. 11/13/17 03:02 PM
Theft deterrent alarm
by gfretwell. 11/12/17 01:39 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
242,659 Are you busy
178,871 Re: Forum
170,085 Need opinion
Who's Online Now
0 registered members (), 11 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#214494 - 12/15/14 09:52 PM Automating mutiple independently controlled motors  
sparkyinak  Offline
Member
Joined: Jul 2007
Posts: 1,328
Alaska
Here is a scenario. You have an older building that has multiple HVAC systems, fans, etc., throughout the building. Each sub system operates independently of one another. One day, the powers that be wants to integrate all these independent systems and control them with a central controller. All these fans and motors are various sizes and voltages running off of separate panels throughout the building.

Question: Does the control signal from the new control panel have to control the existing run circuits at each existing starter or can the existing motor and fan control circuits be looped through the new control panel?

I think the control panel must supply the coil power to the relay coils because by looping the control circuit through the control panel will leave multiple "hot" wires in the control panel even when the control panel is powered off presuming each existing motor starter has its own power source. At the same time a lighting control panel can have multiple circuits feeding the contactor from several panels and have the same issues of multiple "hot" wires in a control panel that is off.

By looping the existing run circuits to the new panel would eliminate the cost of retrofitting all the starters in the building to be compatible to the new control panel but I can not find a reference anywhere this either option is right or wrong.

Thoughts?


"Live Awesome!" - Kevin Carosa

Work Gear for Electricians and the Trades

#214495 - 12/15/14 11:00 PM Re: Automating mutiple independently controlled motors [Re: sparkyinak]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
http://www.kmccontrols.com/products/Understanding_Building_Automation_and_Control_Systems.aspx

I don't work that end of the street, but I bet that the big players have already addressed what constitutes optimal design.

http://www.buildingtechnologies.sie...on/pages/building-automation-system.aspx

I believe that Honeywell is a major player.

http://buildingcontrols.honeywell.com/Building-Automation-Systems

This kind of design issue is exactly the type I throw to the specialists.

I'm simply not effective working well away from what I know.


Tesla


Member Spotlight
mersadrad
mersadrad
Montreal, Quebec, Canada
Posts: 28
Joined: March 2011
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 15 (0.003s) Memory: 0.7448 MB (Peak: 0.8629 MB) Zlib enabled. Server Time: 2017-11-24 07:18:11 UTC