ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
Recent Posts
Windows 10, who's upgraded?
by geoff in UK. 05/29/17 01:05 PM
How do you find a good employee?
by ElectricianBud. 05/27/17 10:58 AM
Recall notice: Bosch Solar panels
by ElectricianBud. 05/27/17 10:53 AM
Correct rotation, wrong sequence
by Potseal. 05/27/17 12:15 AM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,983 Are you busy
172,001 Re: Forum
164,871 Need opinion
Who's Online Now
1 registered members (geoff in UK), 77 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#212570 - 01/23/14 09:33 PM Botched concrete pour knocks out London subway...  
NJwirenut  Offline
Member
Joined: Sep 2001
Posts: 806
Bergen County, NJ
Service on London's Victoria Line was suspended when a room full of signaling gear was flooded with fast setting concrete from a nearby project. Would HATE to be the guy who has to clean this mess up...

http://www.telegraph.co.uk/news/ukn...s-London-Undergrounds-Victoria-Line.html


Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement

#212586 - 01/24/14 09:14 PM Re: Botched concrete pour knocks out London subway... [Re: NJwirenut]  
NORCAL  Offline
Member
Joined: Sep 2002
Posts: 869


#212589 - 01/24/14 09:45 PM Re: Botched concrete pour knocks out London subway... [Re: NJwirenut]  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA

It worked fine for me smile


#212613 - 01/27/14 01:42 AM Re: Botched concrete pour knocks out London subway... [Re: electure]  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
I guess this is a wake up call to everyone that deals with cement in their day to day work.
Could be someone that failed to seal one of their ducts, could be someone that failed to glue a conduit.

Malleable cement has a large horizontal force as well as a vertical force, it will blow out any ducting or conduits that aren't held in place, therefore giving the "molten" cement somewhere to travel.

I was always trained to use a primer AND adhesive on any PVC conduit install, treat it like it is a pressurised water pipe they said.



Let's face it, these days if you're not young, you're old - Red Green grin


Member Spotlight
togol
togol
NW In. USA
Posts: 421
Joined: September 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 15 (0.003s) Memory: 0.7617 MB (Peak: 0.8940 MB) Zlib enabled. Server Time: 2017-05-29 17:13:08 UTC