ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
What do you do?
by gfretwell. 09/24/17 12:05 PM
75 kva tranformer
by sparkync. 09/23/17 06:41 PM
Another generator question
by gfretwell. 09/23/17 04:15 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,959 Are you busy
176,756 Re: Forum
168,603 Need opinion
Who's Online Now
1 registered members (Admin), 68 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#212262 - 12/27/13 01:11 AM Romex before dry in  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,118
Estero,Fl,usa
There was a question on the building code forum that got some conversation.
Can you pull in Romex before the building is completely dried in?
Contractors seemed to say maybe or it was OK, most of the inspectors just said no.

It sounds like a classic damp location to me. Maybe if they could find NM-c but that seems to be a ghost product. The manufacturer sites I looked at send you to UF when you search on NM-c


Greg Fretwell

2017 / 2014 NEC & Related Books and Study Guides

#212264 - 12/27/13 01:35 AM Re: Romex before dry in [Re: gfretwell]  
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
I don't have much of a problem. Heck, nearly every job seems to have 'complete' delayed by a window here and a door there. A little rain won't bother the Romex. Period. Just think of all the other 'indoor' materials that are OK for temporary, in the weather, on-site exposure (OSB, etc).

More of a concern is theft and vandalism; that's the real reason most EC's wait until the site can be 'secured.'

Thermal insulation is another matter. I suspect that most places schedule the 'rough' wiring just before they complete the 'dry in;' they want the sparkies out of the insulator's way, and the sparkies prefer to not have to work around piles of drywall.


#212270 - 12/27/13 05:41 PM Re: Romex before dry in [Re: gfretwell]  
shortcircuit  Offline
Member
Joined: Jun 2004
Posts: 608
massachusetts
They don't make NMC anymore. With UF on the market, NMC went to the wayside.

We need to be weather tight round here to pull romex in...


#212272 - 12/27/13 07:44 PM Re: Romex before dry in [Re: gfretwell]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
With experience, electrical contractors have found that the framing is not really done until it's a dry box: house wrap going on even before the last nail goes in.

Not withstanding the contract or verbal assurances, it's discovered that GCs and owners feel free to re-frame right up until the last moment -- especially if the framing crew is still on site.

The extras imposed uppon the EC are not going to be accepted/ paid for as a consequence.

Further, the EC has all of the joy of working around another trade -- that's not used to working around others.

The correct sequence is:
Frame all the way to house wrap...
Plumbers...
Electricians...
Insulation...
Sheetrock...

For lowest cost: none of these trades expects to work around the others in residential spaces.

Everyone is bidding so tightly that they can't eat imposed mistakes, extras are not tolerated well.

Screwy, clever, ways of speeding up the process oft times result in bankruptcies of the GC.


Tesla

#212273 - 12/27/13 08:08 PM Re: Romex before dry in [Re: gfretwell]  
shortcircuit  Offline
Member
Joined: Jun 2004
Posts: 608
massachusetts
Around here it goes...

Frame...
Roofing...
Windows...
Siding...
Plumbers...
HVAC...
Electricians...
Alarm...
ROUGH INSPECTIONS

The inspectors don't what any dry location material installed until the structure is weather tight...


#212276 - 12/27/13 10:44 PM Re: Romex before dry in [Re: gfretwell]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,864
Brick, NJ USA
Usual scenario is...
Frame
Roofing
Windows/Doors (temp)
HVAC
Plumbers
Electricians
ROUGH INSPECTIONS: Elec/Plumb/Fire
Framing inspection
Insulation
Insulation Inspection

Mix a few 'red tags' inbetween......

The alarm, A/V, Comm slip in accordingly.

No wiring is installed before the structure is weather tight. Very few have tried, none have been successful...


John

#212278 - 12/28/13 03:24 AM Re: Romex before dry in [Re: gfretwell]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,118
Estero,Fl,usa
This was posed as a multi story commercial building. The reference was because of the allowance of Romex above 3 floors. They were asking about starting the wiring on lower floors before the building was topped out and dried in.


Greg Fretwell

#212279 - 12/28/13 03:28 AM Re: Romex before dry in [Re: gfretwell]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,118
Estero,Fl,usa
In SFR around here they usually get the Framing, electrical, plumbing and HVAC (pre drywall)) at the same time (called the FEPA/C) and these days it might be the same inspector doing it all.

In the tough times the more licenses you had, the better chance you were not laid off.


Greg Fretwell

#212281 - 12/28/13 07:27 AM Re: Romex before dry in [Re: gfretwell]  
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
Greg...

I didn't comprehend that the job was that large.

///

Out my way, the AHJ still won't permit Romex beyond 3 floors.

Chicago is paranoid about fires -- hence EMT forever...

California is paranoid about earthquakes -- hence MC is pushed where the NEC would settle for Romex.

MC does have one overriding advantage in commercial construction: it can tolerate structures still open to the elements. That can make it, ultimately, the cheapest way to go: the time to completion can be drastically shortened.

====

In my entire career, I only had one job where the boss wanted to transition from MC to Romex. It was a horrific mistake on his part: the Romex space was too small. Just transitioning wasted whatever materials savings he thought might be had.

Ultimately, he made enough mistakes -- on enough jobs -- to take himself out of the game. His biggest mistake was alienating his foremen while sucking up to his apprentices.

This is a tick seen all too often in the trades: the boss can't leave his own foreman's cap behind -- and treats his (foreman) subordinates like they're still his rivals for promotion -- even though he owns the whole firm!

(Mentally, he was trapped: 'competing' with the design solutions and management grace of his own top men. Doing so, he failed to function as the top manager, top salesman.)




Last edited by Tesla; 12/28/13 07:28 AM.

Tesla

#212293 - 12/29/13 11:28 AM Re: Romex before dry in [Re: Tesla]  
ghost307  Offline
Member
Joined: May 2005
Posts: 911
Chicago Illinois USA
Fire is only the 'official' reason for Chicago requiring that everything be in conduit.


Ghost307

Page 1 of 2 1 2

Member Spotlight
sbi
sbi
indiana
Posts: 47
Joined: March 2008
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.022s Queries: 16 (0.003s) Memory: 0.8210 MB (Peak: 1.0041 MB) Zlib enabled. Server Time: 2017-09-26 19:52:10 UTC