ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,332 Are you busy
174,803 Re: Forum
167,182 Need opinion
Who's Online Now
0 registered members (), 64 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#210019 - 05/22/13 11:20 AM Grounding Feedback  
akmaster  Offline
Member
Joined: Jun 2012
Posts: 70
alaska
Could I have some opinions on this photo of a poor grounding job and some suggestions on correcting? Any code violations except subject to physical damage and workmanlike manner.

Thanks

Greg


Attached Files
photo.JPG (60 downloads)

Don't drive and TEXT! Drive now TALK LATER!

2017 / 2014 NEC & Related Books and Study Guides

#210030 - 05/22/13 08:29 PM Re: Grounding Feedback [Re: akmaster]  
LarryC  Offline
Member
Joined: Jul 2004
Posts: 783
Winchester, NH, US
Is the conduit metal? If so, should it be bonded to the wire?


#210031 - 05/22/13 08:47 PM Re: Grounding Feedback [Re: akmaster]  
akmaster  Offline
Member
Joined: Jun 2012
Posts: 70
alaska
Larry, Thanks for the response. It is PVC schedule 40.
It's out in the walkway too..

Thanks

GW


Don't drive and TEXT! Drive now TALK LATER!

#210033 - 05/22/13 11:23 PM Re: Grounding Feedback [Re: akmaster]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,853
Brick, NJ USA
I have to ask...why is it on the floor, and it appears to be going up a wall on the right??



John

#210088 - 05/26/13 12:44 PM Re: Grounding Feedback [Re: akmaster]  
harold endean  Offline
Member
Joined: Feb 2002
Posts: 2,233
Boonton, NJ
It looks like their measurements were off. It seems like they wanted to pop up right by the beam in order to use it for grounding. Maybe what they should do is abandon the wire going down and trying to pick it up somewhere else. (If possible)

If they can't do that, they should have saw cut the concrete and put the wire in/under the concrete.

It probably meets code but it looks like someone will trip over it.


#210159 - 05/30/13 11:27 AM Re: Grounding Feedback [Re: akmaster]  
BigB  Offline
Member
Joined: Mar 2004
Posts: 719
Tucson, AZ USA
I think I would weld a piece of flat stock from the base of the steel support along the floor over to the wall, then another short piece up the wall or over to where the GEC emerges and tap it there for a lug.

It's still hard to tell in the picture why they did it that way. Looks like two GECs emerging from the slab, is that correct?


Last edited by BigB; 05/30/13 11:35 AM.

#210162 - 05/30/13 05:44 PM Re: Grounding Feedback [Re: akmaster]  
akmaster  Offline
Member
Joined: Jun 2012
Posts: 70
alaska
Hi,
There is a piece of rebar sticking out of the hole. They missed the steel and ran schedule 80 over to bug onto the steel. it is in the walkway and we do not want to buy it...but contractor refuses to fix. I suggested core drilling down to rebar and bugging on there..

poor quality work for sure..

it is coming up through the slab and a nipple from a 4/0 ground...the green is #2.

thanks

Greg


Don't drive and TEXT! Drive now TALK LATER!


Member Spotlight
Joe Tedesco
Joe Tedesco
Boston, Massachusetts USA
Posts: 2,749
Joined: October 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 16 (0.004s) Memory: 0.7851 MB (Peak: 0.9445 MB) Zlib enabled. Server Time: 2017-07-25 22:46:45 UTC