ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 3
Recent Posts
FPE in Germany
by Texas_Ranger. 11/19/17 07:30 AM
Ceiling fan distance from outdoor hot tub
by gfretwell. 11/16/17 02:18 AM
diazed fuses
by Texas_Ranger. 11/13/17 03:02 PM
Theft deterrent alarm
by gfretwell. 11/12/17 01:39 PM
EEPROM errors on XC7Z010-2CLG225I chip
by twh. 11/07/17 05:45 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
242,590 Are you busy
178,769 Re: Forum
170,029 Need opinion
Who's Online Now
1 registered members (Texas_Ranger), 28 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#207777 - 11/26/12 01:19 PM grounding  
Bravo  Offline
Member
Joined: May 2010
Posts: 30
NY, USA
Hello,

Working on designing an electrical grounding system for a industrial building and was wondering if bonding metal hand rails to ground system is a requirement?

Thanks in advance


2017 / 2014 NEC & Related Books and Study Guides

#207780 - 11/26/12 02:08 PM Re: grounding [Re: Bravo]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,135
Estero,Fl,usa
Not unless you determine that they are "likely to become energized". Then you bond them to the circuit EGC that will be likely to energize them. (like if there was ice melting equipment on the steps).


Greg Fretwell

#207783 - 11/26/12 02:56 PM Re: grounding [Re: gfretwell]  
Bravo  Offline
Member
Joined: May 2010
Posts: 30
NY, USA
Thanks for the reply. These are interior stairs and do not anticipate them to be energized. The customer has requested them to be bonded.


#207787 - 11/26/12 07:49 PM Re: grounding [Re: Bravo]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,874
Brick, NJ USA
In that case...the customer is right! Not required by NEC, but by customer spec.


John

#207795 - 11/27/12 10:24 AM Re: grounding [Re: Bravo]  
ghost307  Offline
Member
Joined: May 2005
Posts: 917
Chicago Illinois USA
John, I like your attitude.

I get quite irate when I specifically call for something in the plans and specs only to have the Contractor tell me that "It's not required by the Code so I didn't include it. If you really want it you have to pay me extra".
Then we end up with the fight over what is included in the signed contract and it gets ugly really fast.

Not every job is 'design-build'...sometimes I want something just because I want (or need) it.


Ghost307

#207798 - 11/27/12 02:44 PM Re: grounding [Re: Bravo]  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,874
Brick, NJ USA
Ghost:
Specs that are within or part of the plans, that exceed the required NEC standards must be installed. (Period)

Option is provide a signed and sealed letter from the Lic Design Professional to withdraw the spec item(s).

Thanks for the compliment


John

#207803 - 11/28/12 12:21 AM Re: grounding [Re: HotLine1]  
sparkyinak  Offline
Member
Joined: Jul 2007
Posts: 1,328
Alaska
I know that frustration. Currently dealing with a a contractor to install two simple parts that were spelled out, part number, vendor's name, the works. After missing the deadline by six months, they installed the wrong parts...


"Live Awesome!" - Kevin Carosa

#207804 - 11/28/12 12:46 PM Re: grounding [Re: Bravo]  
Gregtaylor  Offline
Member
Joined: Mar 2005
Posts: 212
Boise, Idaho, USA
Really frustrating as a bidding contractor to get beaten for a project with a price that could ONLY be met by ignoring specs. Project gets built out of spec and someone, somewhere, signs off. Maddening.
I'm with HotLine and Ghost, build it the way its written. Code is a MINIMUM.


#207805 - 11/28/12 03:08 PM Re: grounding [Re: Bravo]  
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
Maybe we need to take a lesson from our local GC's ... or, perhaps, from trades that don't worry about "code.'

I mean ... can you even imagine a customer giving a GC a plan for a 4-bedroom house,and the GC arguing that the zoning ordinance only required three bedrooms for the family? Can you imagine the GC refusing to build it - or building three bedrooms and then arguing with the customer?

Can you imagine a painter arguing with a customer over what color to use?

Now ... let's fast-forward to the end of the job. The GC has built three bedrooms (because that was 'enough' by code) and the painter has decided that 'teal' was a better choice than 'aquamarine.' Would you expect the customer to be happy with that?

All you can do is quote the plans, and note any objections or questions you might have.


#207820 - 11/29/12 01:51 AM Re: grounding [Re: renosteinke]  
sparkyinak  Offline
Member
Joined: Jul 2007
Posts: 1,328
Alaska
So I see you worked in Alaska Reno... laugh


"Live Awesome!" - Kevin Carosa


Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 186
Joined: November 2005
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.018s Queries: 15 (0.002s) Memory: 0.8103 MB (Peak: 0.9927 MB) Zlib enabled. Server Time: 2017-11-20 17:23:27 UTC