ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by HotLine1. 01/22/18 07:31 PM
Photocell
by twh. 01/22/18 05:06 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 6 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Doors of Disconnects #198571
01/27/11 10:21 PM
01/27/11 10:21 PM
S
SJT  Offline OP
Member
Joined: Jul 2002
Posts: 241
PATCHOGUE, N.Y.
There are a number of 100 Amp 600V fusible disconnects that were installed on a project. They had installed a round type of voltage indicator (approx. 2" diameter)onto the front face of the switches. The wiring is then secured to the inside of the door with slack and goes to the Line terminals.
My concern is, are we allowed to mount anything on a door? A lot of people did not see anything wrong with it. I don't like it, and was looking for some code articles that I could hit them with. I never installed anything on the door of a disconnect. Thanks

Work Gear for Electricians and the Trades
Re: Doors of Disconnects [Re: SJT] #198573
01/27/11 10:27 PM
01/27/11 10:27 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 6,919
Brick, NJ USA
Modifications to the enclosure (door, etc.) IMHO would be an issue with the UL listing/labeling. Also, I would have an issue with the volt indicators being on the 'line' side; is there any OCP? How are the terminations of the meter leads made on the 'line' side. What purpose were the voltage indicators installed for?



John
Re: Doors of Disconnects [Re: HotLine1] #198595
01/28/11 06:50 PM
01/28/11 06:50 PM
S
SJT  Offline OP
Member
Joined: Jul 2002
Posts: 241
PATCHOGUE, N.Y.
Thanks John,
I don't think it flies with UL. They were installed in the field. I have to check, if there is fuse protection for the meters. The terminations cannot go under the same lug. I want to check that.
They are using them for a fast visual to determine voltage presence.
When I find out, I'll let you know
Good Day - Steve

Re: Doors of Disconnects [Re: SJT] #198596
01/28/11 06:59 PM
01/28/11 06:59 PM
T
Tesla  Offline
Member
Joined: Jun 2004
Posts: 1,273
Sacramento, CA
The set-up seems poorly thought out. One would want the leads to go to the LOAD terminals so that blown fuses -- and single phasing -- would show up.

Further... Is this out in the open? NEMA 3R?

Are you dealing with 1-phase or 3-phase power?

It's hard to see how meter leads would NOT foul up safe access to the fuses.


Tesla
Re: Doors of Disconnects [Re: Tesla] #198616
01/29/11 02:45 PM
01/29/11 02:45 PM
S
SJT  Offline OP
Member
Joined: Jul 2002
Posts: 241
PATCHOGUE, N.Y.
Tesla,
Three-phase, indoor, and they want the leads on the Line side. Large experimental hallway. I agree, the wiring could be in the way.
To be continued, Thanks -SJT


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
sparky 15
Potseal 15
Popular Topics(Views)
243,597 Are you busy
180,402 Re: Forum
170,868 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.013s Queries: 15 (0.002s) Memory: 0.9665 MB (Peak: 1.1064 MB) Zlib enabled. Server Time: 2018-01-23 06:06:31 UTC