ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
Recent Posts
Correct rotation, wrong sequence
by Potseal. 05/27/17 12:15 AM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,871 Are you busy
171,872 Re: Forum
164,781 Need opinion
Who's Online Now
0 registered members (), 66 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#192415 - 02/12/10 06:19 PM burial for EMT  
Niko  Offline
Member
Joined: Aug 2006
Posts: 356
Campbell, CA
This question came up in class?

"If the EMT has the supplementary protection what is the burial depth?

I suggested table 300.5 column 3 which is for nonmetallic raceways and other approved raceways.

what are your thoughts and comments on this questions?

I know from experience that EMT in direct contact with the eart doesn't last.

Thanks.


Be kind to your neighbor, he knows where you live


Work Gear for Electricians and the Trades

#192419 - 02/12/10 07:36 PM Re: burial for EMT [Re: Niko]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,080
Estero,Fl,usa
Agree all around. I am not sure EMT would actually get "approved" around here. It just turns to red dust in a year or two. Maybe they get away with it in a desert state.


Greg Fretwell

#192429 - 02/13/10 11:30 AM Re: burial for EMT [Re: gfretwell]  
wire twister  Offline
Member
Joined: Nov 2006
Posts: 23
Washington GA USA
I do not know if it would be approved here, but why would one use EMT for burial when PVC will last forever? As far as minium cover, whenever I have any doubt I always go with 24 inches of cover, sort of guaratees no one will dig it up while planting flowers.


#192430 - 02/13/10 11:53 AM Re: burial for EMT [Re: wire twister]  
Rewire  Offline
Member
Joined: Feb 2008
Posts: 165
Missouri
column 3 would be correct as this is another approved raceway.The code allows it because their is no reason to prohibit it. This is a design choice and the code is not a design manual.


#192437 - 02/13/10 04:01 PM Re: burial for EMT [Re: Rewire]  
KJay  Offline
Member
Joined: Nov 2007
Posts: 763
MA, USA
I would say Zero-inches if it's for an outdoor pool or hot tub installation. EMT doesn't appear to be allowed underground for pool feeders or branch circuits, although it looks like it can be used on or within buildings for pool related equipment and feeders with no problem.
Table 680.10 lists minimum cover depths for "other approved raceways" in these areas though, whatever those might be.


#192442 - 02/13/10 08:15 PM Re: burial for EMT [Re: Niko]  
Niko  Offline
Member
Joined: Aug 2006
Posts: 356
Campbell, CA
It was a hypothetical question that the student asked.

Thank you all for your replies.


Be kind to your neighbor, he knows where you live


#192511 - 02/16/10 08:14 PM Re: burial for EMT [Re: Niko]  
mikesh  Offline
Member
Joined: Jun 2006
Posts: 613
Victoria, BC, Canada
Emt cannot be used underground or in ground slabs in Canada Eh!


#192519 - 02/16/10 09:58 PM Re: burial for EMT [Re: mikesh]  
Rewire  Offline
Member
Joined: Feb 2008
Posts: 165
Missouri
I cant think of a reason why you would want to use it.



Member Spotlight
SafetyWired
SafetyWired
Pa, USA
Posts: 44
Joined: July 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 15 (0.003s) Memory: 0.7927 MB (Peak: 0.9569 MB) Zlib enabled. Server Time: 2017-05-27 11:50:28 UTC