ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
MRI LED lights dimmer control replacement - wow!
by ghost307. 01/19/18 11:37 AM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
VDE 0100 to introduce AFCIs
by LongRunner. 01/17/18 10:32 AM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (Troy), 20 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Job Bidding #19047
12/19/02 01:34 PM
12/19/02 01:34 PM
F
FatDog65  Offline OP
Junior Member
Joined: Mar 2002
Posts: 5
Paxton IL
What are some of the ways everyone is bidding jobs, residential & commercial. How much per opening, etc.

Work Gear for Electricians and the Trades
Re: Job Bidding #19048
12/19/02 06:26 PM
12/19/02 06:26 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 6,917
Brick, NJ USA
Most comm is done the old fashioned way, a take off from the plans.....
The per opening thing works for a "plain vanilla box" type job, but anything with any detail gets the take off.

We don't do resi, so I can't comment inteligently. Most of the resi guys I know do the "piece" for the builders and $$$ for the "extras".
John


John
Re: Job Bidding #19049
12/20/02 04:38 PM
12/20/02 04:38 PM
T
The Watt Doctor  Offline
Member
Joined: Dec 2001
Posts: 435
Mont Belvieu, TX
I'm with Hotline. The only way to do it right is by doing a detailed take off.
I can't speak for resi because I haven't really been involved with it that much.

Regards,
Doc


The Watt Doctor
Altura Cogen
Channelview, TX
Re: Job Bidding #19050
12/20/02 07:45 PM
12/20/02 07:45 PM
G
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
OK guys,
I've seen this mentioned several times about detailed take offs. When we do commercial bids we count openings for lights and general use receptacles. When you do a detailed take off for general use ckts. do you estimate conduit and wire by the foot, plus openings???

Our current project has approximately 8,000 openings. It took two men two days just to count the openings........I can't imagine the time it would take to try and detail this stuff.

We do detail out special equipment, ckts., HVAC, feeders, etc.

Just curious,
GJ

Re: Job Bidding #19051
12/20/02 08:31 PM
12/20/02 08:31 PM
C
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
GJ,

Estimating is a full time job!!

When I was learning to estimate, each "opening" would be taken off and entered into the estimating program as an assembly. For instance, 1 receptacle would include one 4" box with strap, mud ring, 2 #10 screws, a ground pigtail, a receptacle, plate, 40' 3/4"EMT (or MC cable, depending), and 120' #12 THHN.

So yes, in my experience, every foot of conduit and wire is counted.

Hope this helps.

Peter


Peter
Re: Job Bidding #19052
12/20/02 09:18 PM
12/20/02 09:18 PM
A
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
I work commercial like GJ. I figure degree of difficulty on the general openings (exposed work, ceiling height, structural design). Then I adjust my price scale to fit the job.

Line item on the rest, service, AC, motors and so forth.

Resi is priced by 120v openings, low voltage, 240v drops and service entrance. No pricing by the sqft.

Re: Job Bidding #19053
12/20/02 10:57 PM
12/20/02 10:57 PM
G
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
"When I was learning to estimate, each "opening" would be taken off and entered into the estimating program as an assembly. For instance, 1 receptacle would include one 4" box with strap, mud ring, 2 #10 screws, a ground pigtail, a receptacle, plate, 40' 3/4"EMT (or MC cable, depending), and 120' #12 THHN. "

CT,
OK, you then have figured your material cost for an opening assembly. How is that different than pricing by the opening? I guess it makes the computer happy?

GJ



[This message has been edited by golf junkie (edited 12-20-2002).]

Re: Job Bidding #19054
12/20/02 10:59 PM
12/20/02 10:59 PM
G
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
Arseegee,

That is exactly how we do it too. Works for me.

GJ

Re: Job Bidding #19055
12/21/02 12:07 AM
12/21/02 12:07 AM
C
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
GJ, yeah, I guess I misinterpreted your question. Oh well...


Peter

[This message has been edited by CTwireman (edited 12-21-2002).]


Peter

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,142
Joined: May 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 18
Potseal 14
Popular Topics(Views)
243,552 Are you busy
180,359 Re: Forum
170,837 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.026s Queries: 14 (0.003s) Memory: 0.9992 MB (Peak: 1.1688 MB) Zlib enabled. Server Time: 2018-01-19 21:29:59 UTC