ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,822 Are you busy
169,596 Re: Forum
162,846 Need opinion
Who's Online Now
0 registered members (), 70 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#19047 - 12/19/02 02:34 PM Job Bidding  
FatDog65  Offline
Junior Member
Joined: Mar 2002
Posts: 5
Paxton IL
What are some of the ways everyone is bidding jobs, residential & commercial. How much per opening, etc.


Work Gear for Electricians and the Trades

#19048 - 12/19/02 07:26 PM Re: Job Bidding  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,809
Brick, NJ USA
Most comm is done the old fashioned way, a take off from the plans.....
The per opening thing works for a "plain vanilla box" type job, but anything with any detail gets the take off.

We don't do resi, so I can't comment inteligently. Most of the resi guys I know do the "piece" for the builders and $$$ for the "extras".
John


John

#19049 - 12/20/02 05:38 PM Re: Job Bidding  
The Watt Doctor  Offline
Member
Joined: Dec 2001
Posts: 435
Mont Belvieu, TX
I'm with Hotline. The only way to do it right is by doing a detailed take off.
I can't speak for resi because I haven't really been involved with it that much.

Regards,
Doc


The Watt Doctor
Altura Cogen
Channelview, TX

#19050 - 12/20/02 08:45 PM Re: Job Bidding  
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
OK guys,
I've seen this mentioned several times about detailed take offs. When we do commercial bids we count openings for lights and general use receptacles. When you do a detailed take off for general use ckts. do you estimate conduit and wire by the foot, plus openings???

Our current project has approximately 8,000 openings. It took two men two days just to count the openings........I can't imagine the time it would take to try and detail this stuff.

We do detail out special equipment, ckts., HVAC, feeders, etc.

Just curious,
GJ


#19051 - 12/20/02 09:31 PM Re: Job Bidding  
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
GJ,

Estimating is a full time job!!

When I was learning to estimate, each "opening" would be taken off and entered into the estimating program as an assembly. For instance, 1 receptacle would include one 4" box with strap, mud ring, 2 #10 screws, a ground pigtail, a receptacle, plate, 40' 3/4"EMT (or MC cable, depending), and 120' #12 THHN.

So yes, in my experience, every foot of conduit and wire is counted.

Hope this helps.

Peter


Peter

#19052 - 12/20/02 10:18 PM Re: Job Bidding  
arseegee  Offline
Member
Joined: Jan 2002
Posts: 324
Statesboro, GA USA
I work commercial like GJ. I figure degree of difficulty on the general openings (exposed work, ceiling height, structural design). Then I adjust my price scale to fit the job.

Line item on the rest, service, AC, motors and so forth.

Resi is priced by 120v openings, low voltage, 240v drops and service entrance. No pricing by the sqft.


#19053 - 12/20/02 11:57 PM Re: Job Bidding  
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
"When I was learning to estimate, each "opening" would be taken off and entered into the estimating program as an assembly. For instance, 1 receptacle would include one 4" box with strap, mud ring, 2 #10 screws, a ground pigtail, a receptacle, plate, 40' 3/4"EMT (or MC cable, depending), and 120' #12 THHN. "

CT,
OK, you then have figured your material cost for an opening assembly. How is that different than pricing by the opening? I guess it makes the computer happy?

GJ



[This message has been edited by golf junkie (edited 12-20-2002).]


#19054 - 12/20/02 11:59 PM Re: Job Bidding  
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
Arseegee,

That is exactly how we do it too. Works for me.

GJ


#19055 - 12/21/02 01:07 AM Re: Job Bidding  
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
GJ, yeah, I guess I misinterpreted your question. Oh well...


Peter

[This message has been edited by CTwireman (edited 12-21-2002).]


Peter


Member Spotlight
NickD
NickD
Amish Country, PA
Posts: 46
Joined: March 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 14 (0.002s) Memory: 0.7996 MB (Peak: 0.9679 MB) Zlib enabled. Server Time: 2017-04-27 18:52:31 UTC