ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
sparky 5
Recent Posts
Permit Snafus...AHJs and Contractors Jump in
by sparky. 04/29/17 05:59 PM
201 volt equipment?
by bigpapa. 04/29/17 12:15 AM
Schneider LC1D09
by jraef. 04/28/17 11:05 PM
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
235,015 Are you busy
169,862 Re: Forum
163,052 Need opinion
Who's Online Now
0 registered members (), 68 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#189537 - 10/15/09 04:26 PM what to do with feeder wires?  
adroga  Offline
Member
Joined: Dec 2007
Posts: 35
canada
I have a weird question...

Just to preface I am a second year apprentice. I need to replace the gutters and fascia boards on my house, but I only have a 100 amp entrance that is below the roofline.

The feeder wires are supported by a hook that screws into the wood fascia boards that extends below the gutter.

In order to replace the fascia I need to unhook the wire support. Is it wise to leave the wires hanging from the weatherhead for a short period of time? Or possibly use a rope looped behind the weatherhead to support the wires?

Thank you for any advice...


Work Gear for Electricians and the Trades

#189540 - 10/15/09 07:10 PM Re: what to do with feeder wires? [Re: adroga]  
mikesh  Offline
Member
Joined: Jun 2006
Posts: 613
Victoria, BC, Canada
Get in touch with the local utility and tell them what you need to do with the facia board. You may have to install a new attachment and add reinforcing so that the facia board is not the only thing the hook is attached to. I don't know what the utility in your area requires but it is not acceptable here to just use a facia board as the only anchor for a clevis. We require something structural like one of the studs or rafters. it is likely that the utility will use a rope with bunch of half hitches attached to a temporary anchor. cover the service drop with an insulating sleeve etc so it is safe for you to change the facia board. I doubt that even as a partly trained electrician that you are allowed to touch those wires.



Member Spotlight
sbi
sbi
indiana
Posts: 47
Joined: March 2008
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 15 (0.002s) Memory: 0.7436 MB (Peak: 0.8610 MB) Zlib enabled. Server Time: 2017-04-30 14:54:05 UTC