ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
75 kva tranformer
by sparkync. 09/23/17 06:41 PM
Another generator question
by gfretwell. 09/23/17 04:15 PM
What do you do?
by gfretwell. 09/22/17 10:37 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,905 Are you busy
176,673 Re: Forum
168,562 Need opinion
Who's Online Now
0 registered members (), 32 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#189537 - 10/15/09 04:26 PM what to do with feeder wires?  
adroga  Offline
Member
Joined: Dec 2007
Posts: 35
canada
I have a weird question...

Just to preface I am a second year apprentice. I need to replace the gutters and fascia boards on my house, but I only have a 100 amp entrance that is below the roofline.

The feeder wires are supported by a hook that screws into the wood fascia boards that extends below the gutter.

In order to replace the fascia I need to unhook the wire support. Is it wise to leave the wires hanging from the weatherhead for a short period of time? Or possibly use a rope looped behind the weatherhead to support the wires?

Thank you for any advice...


Work Gear for Electricians and the Trades

#189540 - 10/15/09 07:10 PM Re: what to do with feeder wires? [Re: adroga]  
mikesh  Offline
Member
Joined: Jun 2006
Posts: 613
Victoria, BC, Canada
Get in touch with the local utility and tell them what you need to do with the facia board. You may have to install a new attachment and add reinforcing so that the facia board is not the only thing the hook is attached to. I don't know what the utility in your area requires but it is not acceptable here to just use a facia board as the only anchor for a clevis. We require something structural like one of the studs or rafters. it is likely that the utility will use a rope with bunch of half hitches attached to a temporary anchor. cover the service drop with an insulating sleeve etc so it is safe for you to change the facia board. I doubt that even as a partly trained electrician that you are allowed to touch those wires.



Member Spotlight
MarkC10
MarkC10
CA, Inland Empire
Posts: 43
Joined: September 2013
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 15 (0.003s) Memory: 0.7436 MB (Peak: 0.8612 MB) Zlib enabled. Server Time: 2017-09-24 08:46:09 UTC