ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by HotLine1. 01/22/18 07:31 PM
Photocell
by twh. 01/22/18 05:06 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 6 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Foundation stemwall penetration #178474
06/01/08 10:31 AM
06/01/08 10:31 AM
Z
zero76  Offline OP
Member
Joined: Oct 2004
Posts: 26
olympia
Im about to start a Gymnasium that has a
800a. 480v 3phase service and it's going to have both exterior and interior stem walls that i have to go through. In the past i've done it with the PVC conduit coupling sticking through the form but i'm wondering if it would be better if i used a larger sleeve flush with the inside of the form. If that would be the case what would be the best way to install it and seal it. Could you use a snap tie to hold it in place? Any other ideas?

Thanks in advance for your replies
Z...













Work Gear for Electricians and the Trades
Re: Foundation stemwall penetration [Re: zero76] #178477
06/01/08 11:12 AM
06/01/08 11:12 AM
G
gfretwell  Online Content

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
Get the concrete guys to tie it in there with their wire so they are sure you are not encroaching on the "cover" over the rebar. A ton of concrete dumping in there will probably break a tywrap. I got into this tying my smurf in the tie beam and doweled cells on my addition a couple weeks ago. They took good care of me.


Greg Fretwell
Re: Foundation stemwall penetration [Re: zero76] #178479
06/01/08 11:17 AM
06/01/08 11:17 AM
J
JValdes  Offline
Member
Joined: Jun 2007
Posts: 301
South Carolina
Stem Wall? Not familiar with that term. It sounds like you are talking about a concrete poured wall right?

Re: Foundation stemwall penetration [Re: JValdes] #178481
06/01/08 11:57 AM
06/01/08 11:57 AM
Z
zero76  Offline OP
Member
Joined: Oct 2004
Posts: 26
olympia
By stemwall i mean a foundation wall that sits on top of the footing. In this case the footing is poured first then the forms for the foundation are built on top of that. I guess a stemwall can also be a concrete wall that extends above the slab.

What i call a snaptie isn't a tywrap but a tie that the carpenters use to hold the form together. Its like a rod about the diameter of #9 wire.

I can't count on the concrete guys to do this for me but we'll be working together so we don't screw each other.

Last edited by zero76; 06/01/08 12:00 PM.
Re: Foundation stemwall penetration [Re: zero76] #178483
06/01/08 01:40 PM
06/01/08 01:40 PM
G
gfretwell  Online Content

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
"Snap tie"
OK gotcha. We are really just starting to pour that type of wall here but I know what you mean now. The company that was big in it went under and couldn't sell their forms. Usually a stem wall here is block with doweled cells (#5 rebar) and poured solid across the top when they pour the floor.


Greg Fretwell
Re: Foundation stemwall penetration [Re: gfretwell] #178485
06/01/08 02:34 PM
06/01/08 02:34 PM
T
trollog  Offline
Member
Joined: Oct 2004
Posts: 276
San Diego California USA
If its short and fairly straight you could fill it with expanding foam and a layer of duct tape then chip the foam out later. Other options, if the sleeve is long or curved, fill it with styrofoam "popcorn" packing material, or broken up styrofoam chunks and duct tape the hell out of each end. If you can swing a thin plug of expanding foam on each end in front of the loose stryrofoam chunks then duct tape it that would be good too. I am assuming you want to keep wet concrete out of the thing. As far as fastening goes, lots of tie wire and two small short rebar pieces at each end, tied in to the concrete guy's rebar..

Last edited by trollog; 06/01/08 02:36 PM. Reason: typing errors
Re: Foundation stemwall penetration [Re: trollog] #178491
06/01/08 07:14 PM
06/01/08 07:14 PM
G
gfretwell  Online Content

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
No matter how you seal your conduit (female to female) be sure to run one of his snap ties down the middle to pull the form tight against the pipe and make sure you don't lose it.
I am really getting to be a fan of the concrete guy;''s red tape for these things


Greg Fretwell
Re: Foundation stemwall penetration [Re: gfretwell] #178492
06/01/08 07:21 PM
06/01/08 07:21 PM
Z
zero76  Offline OP
Member
Joined: Oct 2004
Posts: 26
olympia
Im not sure what "red tape" is. what does it do?

Re: Foundation stemwall penetration [Re: zero76] #178497
06/01/08 11:19 PM
06/01/08 11:19 PM
G
gfretwell  Online Content

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
It is a red (so the inspector can see it) PVC kind of tape that they use to seal the seams in the vapor barrier plastic but it is just a good tape. It holds well without the gooey mess you get with duct tape or cheap electrical tape and it is 2". I whipped the ends of wire bundles I shoved through me smurf tube the other day and they slipped through real well.


Greg Fretwell
Re: Foundation stemwall penetration [Re: gfretwell] #178501
06/02/08 10:01 AM
06/02/08 10:01 AM
F
forqnc  Offline
Member
Joined: Dec 2006
Posts: 19
Suffolk,Va, USA
I have not done what you are doing, but just wanted to add if you need to seal the sleeve before concrete is poured could you use a Plumbers Test Cap to seal the ends?

http://www.doityourself.com/icat/testcapsandplugs

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
mxslick
mxslick
Atomic City, ID USA
Posts: 803
Joined: October 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
sparky 15
Potseal 15
Popular Topics(Views)
243,597 Are you busy
180,402 Re: Forum
170,868 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.025s Queries: 16 (0.004s) Memory: 1.0244 MB (Peak: 1.2045 MB) Zlib enabled. Server Time: 2018-01-23 06:06:40 UTC