ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Recent Posts
Feed to spa panel
by HotLine1. 06/25/17 05:28 PM
Weatherhead, POA, height?
by HotLine1. 06/24/17 02:37 PM
Windows 7 update problem
by ampherder. 06/21/17 07:01 AM
Norwegian power?
by dsk. 06/19/17 03:40 PM
Anyone ever take a Furnas A14D drum sw apart?
by gfretwell. 06/17/17 08:14 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
238,233 Are you busy
173,445 Re: Forum
166,253 Need opinion
Who's Online Now
0 registered members (), 47 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#170636 - 11/07/07 06:50 PM High Rise fire alarm replacement (conduit or no?)  
nscherneck  Offline
New Member
Joined: Nov 2007
Posts: 1
Redlands, CA
Hello,

I'm preparing a design to replace an existing fire alarm system with voice evacuation in a six-story building in Southern California. I'm not familiar with the special requirements for high rise buildings. The existing wiring is run in EMT throughout, my question is: is the conduit required or can we run the wiring for the replacement system "open".

We are designing this system as a "like-for-like" replacement to avoid a full submittal to the city.

Thank you,
Nathan


2017 / 2014 NEC & Related Books and Study Guides

#170655 - 11/08/07 09:25 AM Re: High Rise fire alarm replacement (conduit or no?) [Re: nscherneck]  
ghost307  Offline
Member
Joined: May 2005
Posts: 902
Chicago Illinois USA
First off, if it's "like for like", why are you thinking about changing the way that the wiring is protected? If it's in EMT, run the new stuff in EMT.

Secondly, if I read your post correctly, you're intending that there won't be a permit pulled for working on a fire alarm system in a high rise building.

For the first, ask the AHJ; for the second, don't even think about it. Go through the correct channels, get a permit, get it inspected and do right.


Ghost307

#170660 - 11/08/07 10:52 AM Re: High Rise fire alarm replacement (conduit or n [Re: ghost307]  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
There shouldn't have to BE any new wiring necessary on a "like for like", should there?












Member Spotlight
Joe Tedesco
Joe Tedesco
Boston, Massachusetts USA
Posts: 2,749
Joined: October 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 15 (0.002s) Memory: 0.7522 MB (Peak: 0.8769 MB) Zlib enabled. Server Time: 2017-06-26 12:00:00 UTC