ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Trumpy 5
Recent Posts
Another generator question
by gfretwell. 09/21/17 02:41 PM
What do you do?
by gfretwell. 09/21/17 02:33 PM
Supporting conduit bodies
by ghost307. 09/18/17 12:12 PM
Thermal Imaging Camera upgrade
by Potseal. 09/18/17 11:57 AM
Linear Power Supply Quits Under Load
by JoeTestingEngr. 09/15/17 11:37 PM
New in the Gallery:
Gallery Test
Popular Topics(Views)
240,854 Are you busy
176,605 Re: Forum
168,520 Need opinion
Who's Online Now
0 registered members (), 67 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#169152 - 09/27/07 03:52 PM Help with bid  
sparkync  Offline
Member
Joined: Oct 2002
Posts: 826
NC
I don't want you to take a lot of time, but if you could give me your estimate on the following it would help.

I have 15 parking lot lights to mount on 6 existing poles.
There will be 3 lights on 3 poles, and 2 lights on 3 poles.

They will be mounted on 3 light bracket arms and 2 light bracket arms.

The total fixtures and brackets, etc. without mark up is
$ 5258.51

Rental of lift, since I don't have a bucket truck is approx. $ 150 per day plus $50.00 delivery and pick up

I will figure 1 mechanic labor and 1 helper.

the parking lot is slightly angled at the top where 3 poles are located. I will be removing existing lights off the poles, to make way for the new ones.

Right now, I don't know if I'll have to put photo cells on each light or not, or if the whole circuit is controlled by a single photo cell, ( which I would guess it is ). There are a few "unknowns" at this time, which will have to be verified once I know the customer is serious with my bid. I have already figured a bid, just want to see if I come close to some of your bids. I know there could be a lot of variables here, but I would just like your "educated guess".

If you could give me your input from what I have given you, it will be greatly appreciated. Thanks, Steve....



Work Gear for Electricians and the Trades

#169153 - 09/27/07 05:08 PM Re: Help with bid [Re: sparkync]  
wire_twister  Offline
Member
Joined: Jul 2007
Posts: 265
Georgia USA
Are the new lights the same as the old ones, or will you have to install new mounts too? What type of lights are they? Will they require new wire or is the existing sufficient?


Jimmy

Life is tough, Life is tougher when you are stupid

#169155 - 09/27/07 05:47 PM Re: Help with bid [Re: wire_twister]  
Jps1006  Offline
Member
Joined: Jan 2004
Posts: 615
Northern IL
2 guys 3-days


#169157 - 09/27/07 07:38 PM Re: Help with bid [Re: wire_twister]  
sparkync  Offline
Member
Joined: Oct 2002
Posts: 826
NC
Jimmy, the new lights will be 250 watt HPS floods and will have to have new mounts which is noted in the prices I gave. I will have to verify if existing wire size is sufficient once I'm sure they're interested in the "bottom line price" I give them. No sense in me taking time to go through their electrical system etc. etc., if the price for just changing the lights is too much for them. Thanks, Steve...


#169161 - 09/27/07 08:32 PM Re: Help with bid [Re: sparkync]  
wire_twister  Offline
Member
Joined: Jul 2007
Posts: 265
Georgia USA
2 to 2.5 man hours per fixture plus lift rental. Do not forget to add for upgrading wire if needed, and photocells


Jimmy

Life is tough, Life is tougher when you are stupid

#169188 - 09/28/07 12:44 PM Re: Help with bid [Re: wire_twister]  
JValdes  Offline
Member
Joined: Jun 2007
Posts: 301
South Carolina
Don't forget to mark it up. You don't want to get hung on a job where you lose money.

If it were me, I would add 25% to your total cost. So, you don't get the job. At least you did not lose anything except the job.

You need to become a salesman of sorts in this type of scenario. Why you are higher than others and why quality and craftsmanship are just as important as price.

I have lost jobs over price. But it's part of doing business.


#169204 - 09/28/07 07:45 PM Re: Help with bid [Re: JValdes]  
macmikeman  Offline
Member
Joined: Jul 2002
Posts: 717
Honolulu, Hawaii
For me, I don't want every job that comes along, I want every job that comes along to be profitable. So unless you have no other work to fall back on, what I would do here is figure out all the costs associated with this endevor, include the proper overhead figure to breakeven, and then double that number and submit it. Work less for more, and reach financial success.


#169214 - 09/28/07 10:29 PM Re: Help with bid [Re: macmikeman]  
gfretwell  Offline


Member
Joined: Jul 2004
Posts: 9,115
Estero,Fl,usa
Probably just Gee whiz info but my wife just got a proposal. 13 lights, 13 posts, anchors and run the wire $27,000.
The owners are still thinking about solars at $3000 a pop. I think they are crazy.


Greg Fretwell

#169220 - 09/29/07 03:29 AM Re: Help with bid [Re: gfretwell]  
Active 1  Offline
Member
Joined: Feb 2003
Posts: 687
Grayslake IL, USA
Something to keep in mind. If for some reason there is a issue a short time later you may need to rent the lift again. Add labor on that and one bad fixture could cost you X amount. I would say add a bit more than normal to cover any warrenty issues.


#169226 - 09/29/07 06:29 AM Re: Help with bid [Re: Active 1]  
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,707
Anaheim, CA. USA
I know you said the shoe boxes will be replaced on the existing poles, but I was wondering about a few things:

* Do you need to remove + replace any existing Light Standards ("Poles"), or are the bases & poles devoid of damage issues?

* Did any original standards fall when a strong wind came along (reason #1 for the Client to have Parking Lot Lighting replaced)

* How tall are these poles?

It is going to be a PITA to setup the fixtures with the poles already standing, and the PITA value increases exponentially for every 5 feet exceeding the most smallest of poles (8 foot pole, +30" base, minimum PITA value @ 10'6" above finish grade).

Another PITA extreme will come in the form of removing the existing fixtures (if any), without dropping them on cars, or dropping them at all (large mess to clean up).

You may need to increase your labor an additional 50% to compensate for the "Circuis-Like Work Environment" involved with tasks such as this.

Let us know how things work out here!

Scott


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

Page 1 of 2 1 2

Member Spotlight
Scott35
Scott35
Anaheim, CA. USA
Posts: 2,707
Joined: October 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.020s Queries: 16 (0.004s) Memory: 0.8197 MB (Peak: 0.9988 MB) Zlib enabled. Server Time: 2017-09-21 19:30:32 UTC