ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
Admin 4
Recent Posts
Correct rotation, wrong sequence
by Potseal. 05/25/17 11:34 PM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,791 Are you busy
171,815 Re: Forum
164,730 Need opinion
Who's Online Now
0 registered members (), 56 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#167650 - 08/16/07 10:45 PM Separately Derived Systems in the same pull box?  
techgod  Offline
Member
Joined: Dec 2003
Posts: 20
Burbank, Ca USA
I am currently installing a generator for optional standby loads in an office building. The Generator has two output breakers, one feeds a 120/208 ATS, the other feeds a 75kVA transformer near the generator for a 277/480V feed for a 277/480 ATS for the lighting loads. I also have a conduit with 277/480V feeders for a transformer & sub panel near the generator for the engine heater & battery charger ect. Can all of these conduits & feeders share the same junction box for an angle pull?

TIA,
Mark


2017 / 2014 NEC & Related Books and Study Guides

#167654 - 08/17/07 06:27 AM Re: Separately Derived Systems in the same pull box? [Re: techgod]  
Roger  Offline
Member
Joined: May 2002
Posts: 1,716
N.C.
Yes, being that this is an optional standby system.

Roger



Member Spotlight
renosteinke
renosteinke
Blue Collar Country
Posts: 5,316
Joined: January 2005
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 15 (0.003s) Memory: 0.7435 MB (Peak: 0.8601 MB) Zlib enabled. Server Time: 2017-05-26 05:35:17 UTC