ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
sparky 5
Recent Posts
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 04/30/17 02:30 PM
201 volt equipment?
by bigpapa. 04/29/17 12:15 AM
Schneider LC1D09
by jraef. 04/28/17 11:05 PM
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
235,042 Are you busy
169,884 Re: Forum
163,072 Need opinion
Who's Online Now
0 registered members (), 63 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#159268 - 11/18/06 08:31 PM Remodel  
Sparks30  Offline
Member
Joined: Mar 2002
Posts: 125
Connecticut.usa
Question is ,what is a good price for this, all devices are old work. I can only channel for drilling joist.

5-5" Recessed lights in kitchen controlled from 2 different switches.
Under cabinet lights controlled from 2 different switches.
Remove and reroute wires in wall for new garage door.
Bring kitchen outlet up to code. ( wall spacing and circuits)
Refrige on it's own circuit to generator panel.
Micohood on it's own circuit to generator panel.
Dishwasher on dedicated circuit to regular panel.
1-4" Recessed light on switch for over the sink.
Rewire garbage disposal to meet code. ( single pole )
Install programmable T-stat.
Replace existing range wire and outlet to meet code. ( 60ft )
Remove and replace light at top of stairs with recessed light. ( Limited working space )
Dedicated outlet for fireplace. ( Gas )
New outlet for flat sceen TV over fireplace.
New cable outlet for TV over fire place.
Install multiple smoke and co detectors on dedicated circuit. ( 5-6 )


Business, Office, Estimating, Legal:

#159269 - 11/18/06 11:47 PM Re: Remodel  
Trick440  Offline
Member
Joined: Aug 2005
Posts: 248
Waterford, MI, USA
I think that would be very hard for anyone on here to price that out without seeing the job.

Is there drywall up? Is there a basement, attic access? How dirty and how much crap is in the way?

If there is no drywall in the way I would say atleast around $1800+ material. Or whatever you charge for 3 full days.


[This message has been edited by Trick440 (edited 11-18-2006).]


Shake n Bake

#159270 - 11/19/06 09:10 AM Re: Remodel  
Sparks30  Offline
Member
Joined: Mar 2002
Posts: 125
Connecticut.usa
Little crawl space about 2 ft wide around the back side of house. And all sheetrock on ceiling to remain. Panel is in gaage with open ceiling. Basement is open.

[This message has been edited by Sparks30 (edited 11-19-2006).]



Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,137
Joined: May 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 14 (0.003s) Memory: 0.7521 MB (Peak: 0.8748 MB) Zlib enabled. Server Time: 2017-05-01 00:34:09 UTC