ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by HotLine1. 01/22/18 07:31 PM
Photocell
by twh. 01/22/18 05:06 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 22 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
have you guys ever done practice bids ? #155145
12/11/04 11:30 AM
12/11/04 11:30 AM
D
detubbs  Offline OP
Member
Joined: Nov 2004
Posts: 56
PA
have you guys ever done practice bids on here(for fun) for a fictional job? for instance the moderator or webmaster could give us the material breakdown for a job and we all could "bid" it like we do and see how things turn out? granted due to area differences some maybe extremely high or low incomparrison to everyone else but it still could be fun and a learning experiance for us Estimators / Electricians!


Scott
Business, Office, Estimating, Legal:
Re: have you guys ever done practice bids ? #155146
12/11/04 12:01 PM
12/11/04 12:01 PM
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,890
NY, USA
This was something we kicked around a couple years ago (!!) but never really got started.

I still don't know how feasible it is, but the idea was to make a set of plans available to interested members in a format (some form of CAD?) that could be printed out at a local printer and we could all discuss things like NEC (minimum/++) requirements, layout, takeoff and estimating options.

The idea was to do a couple of different types of buildings and layouts.

What do you all think?

Bill

Re: have you guys ever done practice bids ? #155147
12/11/04 01:22 PM
12/11/04 01:22 PM
A
Anonymous
Unregistered

As far as everyone being able to view the drawings with a free viewer, I was surprised to see that Volo View Express was no longer available from Auto Desk. However, It looks like they still offer a couple other free viewers.... Any opinions here???

I think many estimators have a standard line line I used often. " I don't need the practice anymore". It is not hard to feel that way when you bid day after day and only get maybe 10% of the jobs you bid.

On the other hand. Sure I'll play. Just don't tell me "This 150k sq/ft job bids tomorrow at noon." [Linked Image] [Linked Image]

Edit: I do some of my bidding from a pay fee to be on bid list company that uses On-Screen Take off as a plan viewer. But, I view the files in an OST format and don't know if other extensions can be viewed.

I do know that OST is a free download.

[This message has been edited by kentvw (edited 12-11-2004).]

Re: have you guys ever done practice bids ? #155148
12/11/04 02:18 PM
12/11/04 02:18 PM
G
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
Keep it simple.

If it takes too much time I won't be able to participate.........

It could cut into the time I have to post on internet message boards! [Linked Image]

[This message has been edited by golf junkie (edited 12-11-2004).]

Re: have you guys ever done practice bids ? #155149
12/11/04 04:08 PM
12/11/04 04:08 PM
A
Anonymous
Unregistered

Oh no!
The first thing I would do is fire off an RFI with a couple dozen questions. Either that or low ball this job and qualify be bejaybers out of my proposal. [Linked Image]

Re: have you guys ever done practice bids ? #155150
12/11/04 05:16 PM
12/11/04 05:16 PM
G
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
Sorry,

Residential is T&M only. [Linked Image]

Re: have you guys ever done practice bids ? #155151
12/12/04 12:40 PM
12/12/04 12:40 PM
D
detubbs  Offline OP
Member
Joined: Nov 2004
Posts: 56
PA
if this is a new addition, not a remodel, i think i've got a estimate done for the 3 rooms hall and exterior lighting.


Scott
Re: have you guys ever done practice bids ? #155152
12/12/04 06:30 PM
12/12/04 06:30 PM
N
nesparky  Offline
Member
Joined: Jun 2001
Posts: 642
omaha,ne
Fixing some one elses junk is Time and material only. Latest job of this, I thought the company before me was decent and did good work-- Wrong. So far I have over 90 man hours in just finding what they did and did not do. Plus 15 hours installing all the switches, receptacles and luminares.
Walking the job before hand, I estimated 40 manhours tops.
Thank goodness I bid at time and marerial only.


ed
Re: have you guys ever done practice bids ? #155153
02/24/07 10:22 AM
02/24/07 10:22 AM
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,708
Anaheim, CA. USA
El-Bump'O!!!

Quote

This was something we kicked around a couple years ago (!!) but never really got started.

I still don't know how feasible it is, but the idea was to make a set of plans available to interested members in a format (some form of CAD?) that could be printed out at a local printer and we could all discuss things like NEC (minimum/++) requirements, layout, takeoff and estimating options.

The idea was to do a couple of different types of buildings and layouts.

What do you all think?

Bill


I totally forgot about this!!!!

Anyone think it might be worth trying something simple, and see what transpires?

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Re: have you guys ever done practice bids ? #155154
02/24/07 10:41 AM
02/24/07 10:41 AM
T
Tiger  Offline
Member
Joined: May 2005
Posts: 706
Crystal Lake, IL USA
Personally, I do enough bidding for work to do it for fun.

Dave

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 15
Potseal 13
Popular Topics(Views)
243,605 Are you busy
180,418 Re: Forum
170,875 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.026s Queries: 15 (0.006s) Memory: 1.0220 MB (Peak: 1.1999 MB) Zlib enabled. Server Time: 2018-01-24 03:42:28 UTC