ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Single phase VS three phase generator
by 3nd4. 01/24/18 05:53 AM
AreMetal Ladders Ever OK For Electrical Work?
by HotLine1. 01/22/18 07:31 PM
Photocell
by twh. 01/22/18 05:06 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 4 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
allied 1099 boxs #154539
03/13/07 04:02 PM
03/13/07 04:02 PM
B
big guy  Offline OP
Member
Joined: Dec 2003
Posts: 59
pa
HI
I am working on town homes and would like to know if the opening on a 1099 allied box should be sealed in a fire wall.

1099 boxs are 2hr rated but ones you put wires in the box there will be a open area around the wire.

If I do need to seal this box could I get the info that says that I have to do this.

thanks
matt

Building Codes & Related References
Re: allied 1099 boxs #154540
03/13/07 10:57 PM
03/13/07 10:57 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
If I read this right you need a putty pad to establish the fire rating


Greg Fretwell
Re: allied 1099 boxs #154541
03/14/07 06:12 AM
03/14/07 06:12 AM
S
SteveFehr  Offline
Member
Joined: Mar 2005
Posts: 1,213
Chesapeake, VA
It sounds to me from that listing like the putty pads are only required if you don't meet the minimum separation of boxes. Am I reading that wrong?

The UL listing mentions several times that the gap between the box and the wall must be less than 1/8"- sounds to me like it's implying that some gaps less than 1/8" are acceptable, and cable entries may not need any special sealing.

Re: allied 1099 boxs #154542
03/14/07 01:08 PM
03/14/07 01:08 PM
G
gfretwell  Offline

Member
Joined: Jul 2004
Posts: 9,167
Estero,Fl,usa
Yes you are right Steve. The joys of fire rated assemblies ;(

I was reading the wrong assembly description.


Greg Fretwell
Re: allied 1099 boxs #154543
03/14/07 03:05 PM
03/14/07 03:05 PM
B
big guy  Offline OP
Member
Joined: Dec 2003
Posts: 59
pa
I found it. thanks for the help


http://www.alliedmoulded.com/outlet_fireFAQ.cfm

Re: allied 1099 boxs #154544
03/18/07 11:52 AM
03/18/07 11:52 AM
M
Mark20  Offline
Member
Joined: Mar 2007
Posts: 25
Maryland
if you install 2 boxes in the same stud space of a dimizing wall-- one in "townhome a" and the other in "townhome b" then you would need putty pads for sure. as long as there's only one box in each stud space you shouldn't. at least that's how it's done in washington d.c. is that how everyone else sees it?


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
BEAMEUP
BEAMEUP
WA
Posts: 27
Joined: December 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 15
Popular Topics(Views)
243,607 Are you busy
180,425 Re: Forum
170,876 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.016s Queries: 14 (0.004s) Memory: 0.9752 MB (Peak: 1.1196 MB) Zlib enabled. Server Time: 2018-01-24 11:46:21 UTC