ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
jraef 4
Recent Posts
Correct rotation, wrong sequence
by Potseal. 05/25/17 11:34 PM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,809 Are you busy
171,830 Re: Forum
164,739 Need opinion
Who's Online Now
1 registered members (sparkyinak), 52 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#151292 - 09/27/06 01:04 PM Safety  
WGraver  Offline
Junior Member
Joined: Sep 2006
Posts: 1
DFW Tx.
I'm new to this site and have serious concerns at work. At my last place of employment I was considered green, at my new one... it appears as though I am one of 2 of the most qualified. Last week we had an arc blast incident that gave minor burns to our "senior tech / instructor" and a new hire (2 days after 6 mo. probation), who was severely burned for holding the flashlight too close. The first responder (who got off probation 1 day prior) has had ZERO CPR training in his life. From the pressure / knowledge that I have shown I have been invited to an upper management meeting to try to help / teach them to be safe......................................
I want to be prepared but still don't know how much they are willing to invest. I am working nights and should be in bed right now. I'm happy to put in the time if they will back me. Rumor has it (before this serious incident) that they just want to cover their a**. At this point, when I am called in, I would like to share my past training record (which they have expressed interest in) and know the laws governing Texas / fed for what a qualified electrical worker entails. I'm from California and have always been confused with Ca - vs -fed.


Arc Flash PPE Clothing, LOTO & Insulated Tools

#151293 - 09/29/06 12:11 PM Re: Safety  
XtheEdgeX  Offline
Member
Joined: Apr 2005
Posts: 116
Florida
Where do you work? If you don't mind me asking.


#151294 - 10/02/06 01:55 AM Re: Safety  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
OK WG,
That doesn't sound like a very good start to any new job.
My first question would be, why on earth is a senior technician working on equipment live in the first place?.
Next question would be, what caused the arc-blast to happen?, was it an un-insulated tool dropped into a live bus system or the like?.

It sounds to me that there was very little PPE worn by the new fella, why is this?.
If you want to instill an environment of safety in a new hire, you give them all the PPE they require as they walk in the door.
That has been the way that any company that I have ever worked for has done things.

Workplace safety is not a set of rules and regulations, it is a mind-set, if you don't have that culture instilled into people you are wasting your time pretty much.

What sort of experience do you have in this area (ie Safety tuition)?.
With regards to the 1st responder having no CPR experience, that has IMO been caused by management hiring the wrong person.
I mean good lord, any idiot knows that if you are required to respond to an emergency, some sort of actual training is important.

WG,
If you have any questions or anything, please by all means, ask away, this is what this area is for.

BTW, Welcome to ECN, mate.
Cheers,
Mike. [Linked Image]


Let's face it, these days if you're not young, you're old - Red Green grin

#151295 - 10/07/06 11:45 PM Re: Safety  
tajoch  Offline
Member
Joined: Feb 2001
Posts: 54
Quinlan texas, usa
In Tx, there aren't many laws protecting workers.
As for working on a live control panel, a great % of troubleshooting control circuits requires it to be live.
One nationaly known company that I worked for, this wasn't a problem, it was company policy that the high voltage circuits be in the right hand side of the cabinet and the controls be in the left hand side of the cabinet. as I was leaving them, they also required that all 460+ circuits have plexi-glass shields over the exposed portions.......



Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.015s Queries: 14 (0.002s) Memory: 0.7622 MB (Peak: 0.8920 MB) Zlib enabled. Server Time: 2017-05-26 13:06:34 UTC