ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
jraef 4
Recent Posts
Dryer, Range grounding from "Main" panel
by gfretwell. 05/24/17 09:35 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
Interesting week
by HotLine1. 05/20/17 11:57 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,772 Are you busy
171,789 Re: Forum
164,720 Need opinion
Who's Online Now
0 registered members (), 69 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#140900 - 05/18/04 08:21 AM How (not?) to get site power...  
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,396
Vienna, Austria
The construction safety discussion reminded me of the ingenious way workers get temp power here. Older apartment buildings usually have a box of Diazed main fuses on each floor, in most cases 20 or 25A. Now if people do any work in the stairway, basement, attic, outside,... they usually don't bother looking for a receptacle. They just open the main fuse box and...

[Linked Image]

I guess Edison base threads aren't that tight you can't squeeze a 1.5mm2 stranded wire between fuse and fuse holder threads... ground? Why? It works well without!
Did I already mention those fuses are always _ahead_ of the meters? Oooops...


Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement

#140901 - 05/18/04 02:02 PM Re: How (not?) to get site power...  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
Ragnar,
That has to be the simplest Temporary I've seen in a while. [Linked Image]
I once saw an Electrician cut the plug off of his extension cord, strip back the wires, attach the Earth and Neutral wires to the appropriate bars in the switchboard.
The seal was then broken and the phase wire shoved into the Line terminal of the Main meter. [Linked Image]
He got some free power, until an Inspector dropped by to see what sort of metering equipment was needed for the building upgrade we were doing.
Oops!. [Linked Image]


Let's face it, these days if you're not young, you're old - Red Green grin

#140902 - 05/18/04 03:32 PM Re: How (not?) to get site power...  
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,396
Vienna, Austria
Sounds like a great idea! The marble guys who redid our main hallway thought they were even more ingenious. They had a short piece of 3x1.5mm2 cord with a Schuko trailing socket and 3 alligator clips. They simply clipped to the respective buses, hooking up their wires just protected by a 60A fuse... the old and simple style is at least 25A max.



Member Spotlight
NickD
NickD
Amish Country, PA
Posts: 46
Joined: March 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.031s Queries: 14 (0.022s) Memory: 0.7523 MB (Peak: 0.8752 MB) Zlib enabled. Server Time: 2017-05-25 20:01:01 UTC