ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
MRI LED lights dimmer control replacement - wow!
by ghost307. 01/19/18 11:37 AM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
VDE 0100 to introduce AFCIs
by LongRunner. 01/17/18 10:32 AM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
1 registered members (Troy), 20 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Local Work Sequence?. #136677
04/27/03 02:30 AM
04/27/03 02:30 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
When a new installation goes on-line, what is the sequence of connections, where you live?.
Over here in NZ, the Electrical Inspector gets the CoC from the Electrician who has done the work, he then calls a Line Mechanic, who then gets a Line Crew to hook up the new installation.
How is it, in your country?.

Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Re: Local Work Sequence?. #136678
07/18/03 04:44 AM
07/18/03 04:44 AM
P
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Sorry Mike, looks like I missed this question. Better late than never.... [Linked Image]

As you know, we have no official electrical inspectors here, so the home-owner or developer will liase directly with the PoCo.

Most new properties have the service and meter box outside now, so the builder has to acquire the cabinet and build it into the structure. The contractor will then arrange a date for the PoCo to come and install the meter and their service lateral and connect the tails from the main panel into their meter. In my area, the local PoCo is now called TXU-Energi, but the line work and meter installations are carried ouy by 24-Seven and Siemens respectively.

Re: Local Work Sequence?. #136679
07/18/03 05:41 AM
07/18/03 05:41 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
Thanks Paul for bringing this one up,
But I would like to ask this question.
Being a Power Company employee, off and on, what do you Electricians, hate about the current systems, and how do you reckon you could make them better?.
I hate the system that I work under, so let's hear it from you fellas!. [Linked Image]

Re: Local Work Sequence?. #136680
07/18/03 10:22 AM
07/18/03 10:22 AM
S
Steve|Uk  Offline
Member
Joined: Jul 2003
Posts: 18
Horley, Surrey, UK
Personally, I hate that in recent years the Electricity suppliers have split into far too many different companies.

I finished a job just last month - 2 flats above a shop, on the outskirts of London. I had to have the existing supply cut off by LEB (London Elec Board), get a quote from SeeBoard (South Eastern.....) for the new supply, pay for that, they had to get 24seven (london power network) to arrange for Morrisons (groundworkers) to dig the road, 24Seven then installed the cable, LEB made the joint, and SeeBoard got meterpoint to install the meter.

What is more worrying is that you have to give the meter man a certificate, but he literally threw it away "Oh that'll do". No tests are carried out. Nothing.

I'm getting quite tired of the lack of offical-dom in the UK. We really do need a proper governing body, and set out practices and guidelines.

Regards to all

Steve

(UK)

Re: Local Work Sequence?. #136681
07/18/03 08:17 PM
07/18/03 08:17 PM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
Steve,
I would definitely agree with you there.
I think that the splitting up of power companies, is a world-wide thing, anyone dis-agree?.
Over here, just getting a Nightstore heater, tacked on to the correct Tariff, is an absolute nightmare, half the time the people on the other end of the phone, didn't even know that your town existed, even though they supply Electricity to it!.
The thing that really gets me going, is the customer that can't remember which power company they are with, because the have switched so often(BTW, there are lots of people over here like that!).
It's just one big mess, and power prices are still climbing, so much for the Competition, that this was supposed to bring! [Linked Image]

Re: Local Work Sequence?. #136682
07/19/03 03:13 AM
07/19/03 03:13 AM
P
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
I think most people here are totally confused by the multitude of companies trying to get them to switch suppliers. "Switching" of course, just means that they have a contract with and pay a different company -- There's still only one distribution network in any given area, which to my mind makes the whole thing rather ridiculous. Just about everybody is getting in on the act now, even British Gas (yes, a gas company!).

It's the same sorty of mess as with long-distance phone service. Just look at how many outfits are out to convince you that their deal is the best. As with electricity, it's just too complex for most people.

Re: Local Work Sequence?. #136683
07/19/03 03:53 AM
07/19/03 03:53 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
Paul,
What has not helped things, is the fact that a few of the Supply Companies(as opposed to Lines companies) offer all of these "sweeteners", such as "Get free Sky TV" and win a car and so forth, but as soon as the good will is gone, most customers switch over to the next best offer.
It's a nightmare for us Electrical workers!.
Is this situation the same in the UK, with respect to power companies trying to entice new customers, by these sorts of offers?. [Linked Image]


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
dougwells
dougwells
kamloops BC Canada
Posts: 1,142
Joined: May 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 18
Potseal 14
Popular Topics(Views)
243,552 Are you busy
180,359 Re: Forum
170,837 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.023s Queries: 14 (0.004s) Memory: 0.9860 MB (Peak: 1.1405 MB) Zlib enabled. Server Time: 2018-01-19 21:35:38 UTC