ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
AreMetal Ladders Ever OK For Electrical Work?
by jwes2699. 01/21/18 05:58 PM
VDE 0100 to introduce AFCIs
by sparky. 01/20/18 05:09 PM
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 11 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Main fuse position #134586
11/18/02 01:27 AM
11/18/02 01:27 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
Where is the Main Fuse placed in an installation, in your country?.
This is the fuse, which protects the whole installation and if this blows,you've got a serious fault, in your place. [Linked Image]
Your Help please.........

Test Equipment:
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Large Selection of Test Equipment For Electrical, HVAC, Test & Measurement
Re: Main fuse position #134587
11/18/02 12:41 PM
11/18/02 12:41 PM
C
C-H  Offline
Member
Joined: Sep 2002
Posts: 1,497
Stockholm, Sweden
In the meter or in an enclosure prior to the meter.

Re: Main fuse position #134588
11/18/02 01:39 PM
11/18/02 01:39 PM
S
SvenNYC  Offline
Member
Joined: Aug 2002
Posts: 1,691
New York City
In private residences in Colombia, it is placed after the meter.

In the old days this was a cartridge fuse connected to a large double-pole opens style knife switch on a porcelain or phenolic block.

This was the shutoff for the entire house!

Now a high-amperage circuit breaker before the individual breakers is the norm in good quality professional installations - sometimes you still have a knife switch before the main fuse and breakers (usually retrofits).

Kludges and cowboys still do the knife-switch and cartridge thing. [Linked Image]

Re: Main fuse position #134589
11/18/02 01:50 PM
11/18/02 01:50 PM
P
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
In England it's a cartridge fuse wired ahead of the the meter.

Here are two examples:
[Linked Image]

[Linked Image]

Re: Main fuse position #134590
11/18/02 02:35 PM
11/18/02 02:35 PM
T
Texas_Ranger  Offline
Member
Joined: Dec 2001
Posts: 2,409
Vienna, Austria
In Austria it's either a set of Diazed or Neozed fuses (still lots of Diazed, that's why they're still available), either in the meter enclosure or in an enclosure ahead of the meter (in appartment buildings there's typically 1 diazed enclosure per floor, located in the stairway). In Italy I just saw a main breaker incorporated in the meter.

Re: Main fuse position #134591
11/20/02 01:15 AM
11/20/02 01:15 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
David, what sort of a set up, do you have in
Scotland?, for mains fuses?.
Over here, we use a system of keeping these fuses where only Authorised Persons can access them.
For an overhead reticulated area,the fuse is up on the pole, hence the term, Pole Fuse,
with underground reticulation, we use a pillar box-type arrangement, where there are normally 3 400V fuses and a Neutral Bus rated @ 100A, even though, a single house may be run from this, it allows for future expansion. [Linked Image]

Re: Main fuse position #134592
11/20/02 06:47 PM
11/20/02 06:47 PM
D
David UK  Offline
Member
Joined: Oct 2002
Posts: 134
Inverness, Scotland
Hi Trumpy
Arrangements for main fuse are the pretty well the same as in Paul's part of the world.
PoCo installs main fuse (their property)before the meter, where the service enters the building.
Providing you install the consumer unit or distribution board within 3 metres of the meter, and the tails are the appropriate size (25mm for 100A supply) no additional main fuse is required.
I'm drowning in work at the moment & working all hours, but when I get a chance I'll post some pics of our installations.

Re: Main fuse position #134593
11/21/02 01:33 AM
11/21/02 01:33 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
Power companies over here used to provide a
free length of 25 metres of service main, from their point of connection, no more.
I've hooked up heaps of houses, out in the country, that are set back a fair distance, from the road, the consumer(house-owner), pays for all of the Service Main, normally
3Core+N/Screen, this cable is humungously
expensive, NZ$38/metre + installation.
Now, I get whingeing about the price of getting the Power hooked up.
Administration decisions,eh?, don't you hate
them?. [Linked Image]

[This message has been edited by Trumpy (edited 11-23-2002).]

Re: Main fuse position #134594
11/23/02 11:11 AM
11/23/02 11:11 AM
C
classicsat  Offline
Member
Joined: Nov 2002
Posts: 456
In Canada, it is normall after the meter,
but in some urban residential installations
from the 1940s-50s, I have seen the main fuse/switch before the
meter, with the main fusebox fully accessable by the customer.

Re: Main fuse position #134595
11/23/02 10:40 PM
11/23/02 10:40 PM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,231
SI,New Zealand
I would have thought that placing the main
fuse, which should be an HRC type, before the meters, as this would make more sense,
as the metering equipment would also be protected, have seen meters burn out before!.
Also, Paul,in your pictures,it shows the loadside Phase identified,(this is obviously
single phase), but are you required to identify, with Heatshrink sleeving the three
phases in a poly-phase system at the meters?
Your advice, please.
[This message has been edited by Trumpy (edited 11-23-2002).]

[This message has been edited by Trumpy (edited 11-27-2002).]


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
noderaser
noderaser
Portland, Oregon, United States
Posts: 404
Joined: March 2007
Show All Member Profiles 
Top Posters(30 Days)
Admin 21
sparky 16
Potseal 15
Popular Topics(Views)
243,589 Are you busy
180,383 Re: Forum
170,860 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.018s Queries: 14 (0.003s) Memory: 1.0104 MB (Peak: 1.1876 MB) Zlib enabled. Server Time: 2018-01-22 06:27:47 UTC