ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,885 Are you busy
169,683 Re: Forum
162,919 Need opinion
Who's Online Now
1 registered members (George Little), 56 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#12640 - 08/14/02 08:40 AM Commercial Bidding  
FatDog65  Offline
Junior Member
Joined: Mar 2002
Posts: 5
Paxton IL
What are some of the methodeds used out there for bidding new commercial construction? Do most of you bid new commercial and new industrial the same way?


Work Gear for Electricians and the Trades

#12641 - 08/14/02 06:08 PM Re: Commercial Bidding  
HotLine1  Offline


Member
Joined: Apr 2002
Posts: 6,809
Brick, NJ USA
We bid commercial based on the prints and specs submitted; do our take-off's and apply OH, & % of profit.

Industrial is basically the same methods.

Design/build is a little easier; the take-off process is eliminated as we do the prints and spec.

HotLine1
John


John


Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.002s) Memory: 0.7429 MB (Peak: 0.8599 MB) Zlib enabled. Server Time: 2017-04-28 19:44:14 UTC