ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
MRI LED lights dimmer control replacement - wow!
by Potseal. 01/19/18 08:52 PM
VDE 0100 to introduce AFCIs
by sparky. 01/19/18 08:03 PM
Video: Inventor of the GFCI self-testing shocks
by Bill Addiss. 01/17/18 11:11 PM
FPE in Germany
by HotLine1. 01/17/18 07:07 PM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 6 guests, and 13 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Commercial Bidding #12640
08/14/02 07:40 AM
08/14/02 07:40 AM
F
FatDog65  Offline OP
Junior Member
Joined: Mar 2002
Posts: 5
Paxton IL
What are some of the methodeds used out there for bidding new commercial construction? Do most of you bid new commercial and new industrial the same way?

Work Gear for Electricians and the Trades
Re: Commercial Bidding #12641
08/14/02 05:08 PM
08/14/02 05:08 PM
HotLine1  Offline

Member
Joined: Apr 2002
Posts: 6,918
Brick, NJ USA
We bid commercial based on the prints and specs submitted; do our take-off's and apply OH, & % of profit.

Industrial is basically the same methods.

Design/build is a little easier; the take-off process is eliminated as we do the prints and spec.

HotLine1
John


John

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Attic Rat
Attic Rat
Bergen Co.,N.J. USA
Posts: 524
Joined: December 2003
Show All Member Profiles 
Top Posters(30 Days)
Admin 20
sparky 16
Potseal 15
Popular Topics(Views)
243,561 Are you busy
180,362 Re: Forum
170,840 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.018s Queries: 14 (0.004s) Memory: 0.9406 MB (Peak: 1.0584 MB) Zlib enabled. Server Time: 2018-01-20 08:58:02 UTC