ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
Admin 4
Recent Posts
Correct rotation, wrong sequence
by Potseal. 05/25/17 11:34 PM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,829 Are you busy
171,846 Re: Forum
164,750 Need opinion
Who's Online Now
0 registered members (), 59 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#122982 - 02/12/06 09:43 PM Generator Jobs  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
From RODALCO

Quote
I got a couple of photo's here from a generator connect to a LV side of a distribution transformer after a 11 kV cable fault on polyloom cables.
I have seen on some threads that the generator topic gets raised wheater the neutrals have to be disconnected or not.


My 4 y.o. son Jacob, outside the taped area, he should have PPE on but only posing for the photo, normally the transformer door is closed when we are not working on site of course. Location, Awaruku road, Torbay, Auckland, North Shore.

[Linked Image]


LV side of the transformer. On the newer transformers we have isolating links which break the secondary side from the LV side of the Transformer. Marked as isolator in between Ammeters and fuses.
The orange cables are from the generator, 5 are used normally, R,Y,B, Neutral and Earth. Here in NZ we have the M.E.N. system.
This is one of the more unusual panel lay outs, normally the earth and neutral bar are on the right hand side of the LV panel.
The LV bushings are C,B,A,N at the top visible as B,Y,R and Green, Black.
The small orange, white wires are for the Hotwater pilots, The brown, blue wires are for the Streetlights.

[Linked Image]


Close up of the isolators. TF is 100 kVA and a 220 kVA generator is used to take the load. ( I will check with the crew on monday why the isolators are doubled up).

[Linked Image]


Earth / Neutral bar with 2 cables from generator. and the 3 phases to their resp. busbars

[Linked Image]


Overall view and corner of my hilux ute.

[Linked Image]


LV terminations to generator. ( all is 230 / 400 Volts 50 Hz ).

[Linked Image]


Control panel, load was about 40 Amps per phase, hardly visible on Ammeter, rest is self explanatory, sorry for the reflection on the glass. I gave the panel key to the faultman who already left while I was taking the photo's

[Linked Image]


Thanks, Ray






[This message has been edited by electure (edited 02-12-2006).]


Tools for Electricians:

#122983 - 02/13/06 08:29 AM Re: Generator Jobs  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Looks as though in a year or two you're going to have somebody inside those cabinets with you! [Linked Image]


#163801 - 05/17/07 06:02 PM Re: Generator Jobs [Re: pauluk]  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,211
SI,New Zealand
Good stuff Ray,
Can't imagine how this thread escaped my notice. crazy
Doubled isolators?.


Let's face it, these days if you're not young, you're old - Red Green grin

#169673 - 10/11/07 02:30 PM Re: Generator Jobs [Re: Trumpy]  
PaulCornwall  Offline
Member
Joined: Jun 2003
Posts: 112
England
ahhh nice to see the old colours....

i do miss them



Member Spotlight
Vlado
Vlado
Croatia
Posts: 28
Joined: February 2011
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.7626 MB (Peak: 0.8914 MB) Zlib enabled. Server Time: 2017-05-26 20:50:01 UTC