ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,230 Are you busy
174,629 Re: Forum
167,057 Need opinion
Who's Online Now
0 registered members (), 55 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#121636 - 08/04/05 11:53 PM Foam in Boxes  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
(submitted by Joe Tedesco)
Quote
Hey Joe,


I thought you might like this picture of somebody's "clever" weatherstripping of a receptical. It was found in an apartment renovated a few years ago under a permit! Not too sure how this got slipped past inspection, but all of the recepticals on the outer walls are just like this.

I took this picture myself and you may use it for anything you want.

-Joey
[Linked Image]


Tools for Electricians:

#121637 - 08/05/05 02:21 PM Re: Foam in Boxes  
Radar  Offline
Member
Joined: Apr 2004
Posts: 349
Los Angeles, CA
Kinda wrecks the old box fill calculations, don't it.


There are 10 types of people. Those who know binary, and those who don't.

#121638 - 08/05/05 04:03 PM Re: Foam in Boxes  
alan bergold  Offline
Member
Joined: Nov 2001
Posts: 42
east meadow ny
how do we calculate foam into box fill calculations?


JBIELECTRIC EAST MEADOW NY

#121639 - 08/05/05 06:21 PM Re: Foam in Boxes  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
Easy [Linked Image]

4 x 4 x 1-1/2 Box = 21 cu in per 314.16 (A)

3 #12 conductor @ 2.25 cu in each = 6.75 cu in.

1 device @ 2 x 2.25 cu in = 4.5 cu in

1 Foam job @ 9.75 cu in

Perfect fit [Linked Image]


#121640 - 08/05/05 07:32 PM Re: Foam in Boxes  
sierra electrician  Offline
Member
Joined: Feb 2005
Posts: 219
North Fork, CA USA
4 x 4 x 1-1/2 Box = 21 cu in per 314.16 (A)

3 #12 conductor @ 2.25 cu in each = 6.75 cu in.

1 device @ 2 x 2.25 cu in = 4.5 cu in

1 Foam job @ 9.75 cu in
_________________________________________________

= 0.00 cu in + Fire Hazzard x (10)2 = Complete Violation & Installer must be shot.


#121641 - 08/05/05 10:28 PM Re: Foam in Boxes  
mxslick  Offline
Member
Joined: Oct 2004
Posts: 803
Atomic City, ID USA
But it keeps the recept. and terminals at a constant toasty temperature....what's the problem? [Linked Image]

And it eliminates that annoying loose device wiggle, too.

Constantly amazes me how dumb some people can be...


Stupid should be painful.

#121642 - 08/07/05 07:02 AM Re: Foam in Boxes  
Trumpy  Offline


Member
Joined: Jul 2002
Posts: 8,217
SI,New Zealand
Boy!,
I bet that was hard to get out!.
What's more concerning, is the stuff that Expanding foam is made out of.


Let's face it, these days if you're not young, you're old - Red Green grin

#121643 - 08/07/05 09:19 AM Re: Foam in Boxes  
techie  Offline
Member
Joined: May 2005
Posts: 246
palo alto, ca usa
I see what looking like pink fiberglass insulation the the lower corner of the box.. is there actually a box there? or just a mud ring?


#121644 - 08/07/05 05:45 PM Re: Foam in Boxes  
Theelectrikid  Offline
Member
Joined: Apr 2004
Posts: 810
Levittown, PA
"I see what looking like pink fiberglass insulation the the lower corner of the box.. is there actually a box there? or just a mud ring?"

Is there even a box here? [Linked Image]

[This message has been edited by Theelectrikid (edited 08-07-2005).]


Is there anyone on board who knows how to fly a plane?

#121645 - 08/07/05 08:58 PM Re: Foam in Boxes  
jdadamo  Offline
Member
Joined: Nov 2004
Posts: 37
Calgary, AB, Canada
Yes there is a box there. You will notice that the insulation is actually on the outside of the mudring. What I'm wondering now is where the vapor barrier is. I wonder if somebody stuffed that in there at a later point to plug a leak. It looks like weatherstripping was a huge concern back when this place was renovated.

The reason there is a mudring is because the property is piped and most common pipe installs here use 4x4 boxes with mudrings. There are a few single-gang-with-knockout style boxes, but those are usually at the end of switch loops and only contain two #14s.

Don't let the lack of paint on the receptacle throw you off much either as the maintenance guy of the apartment was not in the habit of removing plates to paint. Almost every plate has a small ring of paint around it. That install has been there, foam and all, I would guess, about five years.

It is unknown to me if the other 166 suites in the building are identical with respect to foaming receptacles on outside walls. I assume so. Some of the suite designs that were missing receptacles in certain places (12 foot rule) had them added using wiremold, so whatever work was done, it obviously had to be made to conform to code at the time of renovation.

I should show you guys a very interesting install that I also snapped a picture of from the same complex. One type of suite had a bedroom receptacle directly behind the fridge, and that recept and the fridge recept were in a single box with a mudring on each side. With both plates off you can look through into the other room! Never, ever seen anything like that before but it was clearly original.

Honestly, aside from the foam, i'd say the wiring as a whole is actually pretty good. All of the devices are P&S, not back-stabbed, etc. Not your standard corner cutting, 35 cent, back stabbed, home depot special--which is much more common.

[This message has been edited by jdadamo (edited 08-07-2005).]


Page 1 of 2 1 2

Member Spotlight
SafetyWired
SafetyWired
Pa, USA
Posts: 44
Joined: July 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.8203 MB (Peak: 0.9958 MB) Zlib enabled. Server Time: 2017-07-23 10:42:49 UTC