600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,345 Are you busy
174,811 Re: Forum
167,191 Need opinion
Who's Online Now
0 registered members (), 51 guests, and 4 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#118510 - 09/30/04 01:20 PM Commercial or Residential "Test" Meter Sockets  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
(submitted via Joe Tedesco)
Quote
Joe, are you familiar with "test" meter sockets? This is the second one that I have come across. The basics are that the meter clips have spring loaded contacts that come forward when the meter is pulled to provide uninterrupted service to the customer. Problem as I see it is that if the utility company serviceman is not aware of the circumstances, the service continues after a meter is pulled and the socket glassed over. Could be a real surprise for an emergency response team that thought the house was deenergized. This was a three phase that looked like it only fed the air conditioning unit, but the double lugged extra wiring extended into the garage to a sub panel with breakers. No disconnecting means at the service panel for the extra wiring.

Tom Erfert (codeenforcementguy)
[Linked Image]

[Linked Image]

[Linked Image]

[Linked Image]


Tools for Electricians:

#118511 - 10/01/04 11:49 AM Re: Commercial or Residential "Test" Meter Sockets  
DougW  Offline
Member
Joined: Jun 2003
Posts: 1,143
North Chicago, IL
Quote
Originally posted by Tom Erfert (codeenforcementguy:

This was a three phase...


If it was a three phase, it was probably intended that the meter never serve as a D/C - we've gotten instruction about that from our PoCo at the Fire Department. You usually see this on bigger commercial/industrial services, where the service D/C is inside, in a marked dead-front panel. On these installs, the meter reads the current, but isn't the primary flow path (Inductance read?).

Recently the PoCo (or a thoughful EC) here has started labeling the meter boxes as "NO SERVICE DISCONNECT - REMOVING METER WILL NOT SHUT OFF POWER", but the labeling has been pretty sporadic.


#118512 - 10/01/04 05:53 PM Re: Commercial or Residential "Test" Meter Sockets  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
That would be a nasty surprise. [Linked Image]

Is it possible this type of socket is already discontinued?

Any bypass meter that I have installed works manually, you have to deliberately move a lever into bypass.


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#118513 - 10/03/04 09:38 AM Re: Commercial or Residential "Test" Meter Sockets  
Dave55  Offline
Member
Joined: May 2004
Posts: 697
Crystal Lake, Illinois, USA
One more reason to test for power even though it appears to be disconnected.

Dave


#118514 - 10/04/04 08:05 PM Re: Commercial or Residential "Test" Meter Sockets  
codeenforcementguy  Offline
Member
Joined: Aug 2003
Posts: 29
Yuma, Arizona USA
I like that Idea of marking the panels that have the test sockets, but agree that it is a big case for always testing for voltage. The first one that I ran across was on an older commerical structure that came into question when no one knew who was paying the utility bill. The business owner rented from the city and said they were, the city PoCo said that the business was, turned out that the utility company was by default.

Make that all user's by default because I am sure the cost was passed on in some form or another.

ERFERTT > codeenforcmentguy


#118515 - 10/04/04 08:44 PM Re: Commercial or Residential "Test" Meter Sockets  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
Out West, EUSERC-style 125-320A manual test-bypass meter sockets are fairly large, but have embossed (paint-proof) notice: “Do not break seal—No fuses inside.”



Member Spotlight
MarkC10
MarkC10
CA, Inland Empire
Posts: 43
Joined: September 2013
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 14 (0.003s) Memory: 0.7786 MB (Peak: 0.9251 MB) Zlib enabled. Server Time: 2017-07-26 10:49:15 UTC