ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/21/17 09:27 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,204 Are you busy
174,601 Re: Forum
167,030 Need opinion
Who's Online Now
0 registered members (), 56 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#117992 - 07/22/04 02:09 AM Panelboard & Service Violations  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
(submitted by Joe Tedesco)
Quote
(picture 1) shows a 208/120V panelboard, typical of panelboards throughout the building. In addition to other violations, notice that the panel is not grounded, that neutrals and grounding conductors are freely mixed on the neutral bus, multiple-colored insulations on neutral bus, white used as a phase conductor in feeder, etc.
[Linked Image]
Quote
(picture 2) shows a Fernco plumbing coupling used on the service conductor raceways between a pad-mounted transformer and the service entrance switchgear. This is a 1200A 480V service.

Enjoy

Robert E. Brown
[Linked Image]


Tools for Electricians:

#117993 - 07/22/04 08:04 AM Re: Panelboard & Service Violations  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
It's a pity that whoever did this must have known better, (note the Touch-Plate relay) but just had no ethics.
It looks like someone pulled the feeder as a 1Ø, and then, when they realized that it was 3Ø, just tried to make it work.
This job stinks.


#117994 - 07/22/04 08:15 AM Re: Panelboard & Service Violations  
pauluk  Offline
Member
Joined: Aug 2001
Posts: 7,520
Norfolk, England
Quote
It looks like someone pulled the feeder as a 1Ø

As in thinking it was a 120/240V panel? Sounds plausible from the feeders there. I don't know how long that feeder is, but how hard would it have been to just pull in another blue conductor and do the job properly? [Linked Image]

Any idea what that transformer on the top of the panel is feeding? And what's that gizmo to the right of it?

Even if the xfmr secondary is low voltage, the open wirenutted splices outside the panel are still very messy and I don't think much of the mounting and wiring method.



[This message has been edited by pauluk (edited 07-22-2004).]


#117995 - 07/22/04 12:21 PM Re: Panelboard & Service Violations  
Lostazhell  Offline
Member
Joined: Feb 2004
Posts: 1,431
Bakersfield, CA (Originally Or...
Scott,
That would be my guess also... The plumbing fitting is a nice touch! [Linked Image]
Pauluk,
The gizmo is a "Touch-Plate" relay.. Typically we find these in a pull can with about 20-30 other ones & a transformer to power them.... I've seen these things used here & there for all the switching in a house.. (Usually, a frustrated customer is asking to get rid of it!) Here's a link to their site... For the longest time, I thought they were out of biz.. I was wrong! http://www.touchplate.com

-Randy


#117996 - 07/22/04 07:43 PM Re: Panelboard & Service Violations  
electricman2  Offline
Member
Joined: Nov 2003
Posts: 269
Thomasville, NC USA
If this is a 3phase panel then the green wire is being used as the grounded conductor, right? I like the set screw coupling on top too, the pipe must hav been a little short. [Linked Image]


John

#117997 - 07/23/04 09:38 PM Re: Panelboard & Service Violations  
classicsat  Offline
Member
Joined: Nov 2002
Posts: 456
Touchplate looks like a new version of those GE home control systems from the 1950s.


#117998 - 07/23/04 09:49 PM Re: Panelboard & Service Violations  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
Touchplate was a competitor with those old GE systems. They've been around a long time.
Go check out a new GE LV lighting control, and you'll see they use the same relays as they used then.

Touchplate has a ratcheting relay that advances on-off etc, each time it's given a signal from the momentary switch, so it only needs 2 wires to connect it.
The GE's need separate on and off signals from the switch, so require 3 wires.



Member Spotlight
Scott35
Scott35
Anaheim, CA. USA
Posts: 2,707
Joined: October 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.013s Queries: 14 (0.002s) Memory: 0.7868 MB (Peak: 0.9402 MB) Zlib enabled. Server Time: 2017-07-22 14:34:58 UTC