ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
Dimmable LED 2x4 lay in fixtures
by HotLine1. 04/24/17 05:43 PM
Old decora style outlets
by Lostazhell. 04/22/17 07:59 PM
Permit Snafus...AHJs and Contractors Jump in
by gfretwell. 04/22/17 01:11 PM
How do you find a good employee?
by HotLine1. 04/22/17 10:44 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,751 Are you busy
169,498 Re: Forum
162,792 Need opinion
Who's Online Now
0 registered members (), 57 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#116719 - 04/17/04 08:27 PM Carpenters Handy-work.  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
This service was right off a main road about a mile from my house.

It stayed this way for at least a month, then it was as far as I can tell just been screwed back in place.

I was afraid to get to close to it when I took my pictures.

[Linked Image]

[Linked Image]


OT but does anyone think the temporary support for the roof over hang is a little small? [Linked Image]



[This message has been edited by iwire (edited 04-17-2004).]


Bob Badger
Construction & Maintenance Electrician
Massachusetts

Tools for Electricians:

#116720 - 04/17/04 09:02 PM Re: Carpenters Handy-work.  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Bob,
We see this all the time, siding contractors try to be the lowest bidder, most of them just pull the meter pan and lateral away from the house, and leave it that way.
Brain dead to the hazzards involved, one contractor working for an area box store, told his guy were not paying an electrician just to remove the box, so he had his helper pull the meter pan off the wall, the fire department arrived first, they were busy trying to help the injured worker, the home was pretty much gone.
Injured worker, lost home, law suit, Ya, he din't need an electrician.


#116721 - 04/18/04 06:24 AM Re: Carpenters Handy-work.  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Oh yeah I do see the hanging services quite often, [Linked Image] what really bothered me was the bottom raceway broken out at a 90 degree angle.

When I was an apprentice the guy I worked for put the services back up that a siding contractor pulled down, most times we would sell a new service at the same time. [Linked Image]

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#116722 - 04/19/04 08:18 PM Re: Carpenters Handy-work.  
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
Hey Bob, that looks all too familiar. many of the vinyl wraps seem to leave this in their wake.

My friends house has their meter socket held down only by the 2 SEU straps above and below the meter. [Linked Image]
Thanks a lot, "home improvement" contractor. [Linked Image]


Peter

#116723 - 04/20/04 01:45 PM Re: Carpenters Handy-work.  
Cobtronics  Offline
Member
Joined: Jul 2003
Posts: 18
Vermont
Float the pan? No problem. I replaced my Bilco cellar entry with a real, stick built entryway last fall. The meter pan was -um- attached to the side of the old 2X6 picture frame they hung the Bilco on with two 8-32 machine screws and about a quart of roofing tar from the caulking job. Called POCO for a standard 6hr disco/reconnect. Linemen showed up at 8:30, opened the pan and floated it instead, said they'd be back at 2:00 to reattach. (Good thing it was cold so the tar shattered.) This was first week in October. They finally got around to reattaching the pan the day before Thanksgiving. Didn't have a seal until New Years. "It ain't just the carpenters and vinyl guys."


#116724 - 04/20/04 08:22 PM Re: Carpenters Handy-work.  
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Cobtronics,
Around here it is the carpenters and vinyl guys, The utility companies in this area don't install service equipment, we install the meter pan, and it takes about 20 minutes for a UG install and about 1-1/2 for an OH install, I can't believe a utility company would leave a hazzard like that, what utility company do you have?



Member Spotlight
mersadrad
mersadrad
Montreal, Quebec, Canada
Posts: 28
Joined: March 2011
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.024s Queries: 14 (0.004s) Memory: 0.7773 MB (Peak: 0.9206 MB) Zlib enabled. Server Time: 2017-04-26 21:38:50 UTC