ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Air Compressor feeder conductor sizing
by Potseal. 01/15/18 09:08 PM
VDE 0100 to introduce AFCIs
by LongRunner. 01/15/18 11:38 AM
Under carpet cable?
by HotLine1. 01/15/18 09:57 AM
Any New Years Resolutions?
by Bill Addiss. 01/13/18 10:21 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 19 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Carpenters Handy-work. #116719
04/17/04 07:27 PM
04/17/04 07:27 PM
I
iwire  Offline OP
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
This service was right off a main road about a mile from my house.

It stayed this way for at least a month, then it was as far as I can tell just been screwed back in place.

I was afraid to get to close to it when I took my pictures.

[Linked Image]

[Linked Image]


OT but does anyone think the temporary support for the roof over hang is a little small? [Linked Image]



[This message has been edited by iwire (edited 04-17-2004).]


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Tools for Electricians:
Re: Carpenters Handy-work. #116720
04/17/04 08:02 PM
04/17/04 08:02 PM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Bob,
We see this all the time, siding contractors try to be the lowest bidder, most of them just pull the meter pan and lateral away from the house, and leave it that way.
Brain dead to the hazzards involved, one contractor working for an area box store, told his guy were not paying an electrician just to remove the box, so he had his helper pull the meter pan off the wall, the fire department arrived first, they were busy trying to help the injured worker, the home was pretty much gone.
Injured worker, lost home, law suit, Ya, he din't need an electrician.

Re: Carpenters Handy-work. #116721
04/18/04 05:24 AM
04/18/04 05:24 AM
I
iwire  Offline OP
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Oh yeah I do see the hanging services quite often, [Linked Image] what really bothered me was the bottom raceway broken out at a 90 degree angle.

When I was an apprentice the guy I worked for put the services back up that a siding contractor pulled down, most times we would sell a new service at the same time. [Linked Image]

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: Carpenters Handy-work. #116722
04/19/04 07:18 PM
04/19/04 07:18 PM
C
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
Hey Bob, that looks all too familiar. many of the vinyl wraps seem to leave this in their wake.

My friends house has their meter socket held down only by the 2 SEU straps above and below the meter. [Linked Image]
Thanks a lot, "home improvement" contractor. [Linked Image]


Peter
Re: Carpenters Handy-work. #116723
04/20/04 12:45 PM
04/20/04 12:45 PM
C
Cobtronics  Offline
Member
Joined: Jul 2003
Posts: 18
Vermont
Float the pan? No problem. I replaced my Bilco cellar entry with a real, stick built entryway last fall. The meter pan was -um- attached to the side of the old 2X6 picture frame they hung the Bilco on with two 8-32 machine screws and about a quart of roofing tar from the caulking job. Called POCO for a standard 6hr disco/reconnect. Linemen showed up at 8:30, opened the pan and floated it instead, said they'd be back at 2:00 to reattach. (Good thing it was cold so the tar shattered.) This was first week in October. They finally got around to reattaching the pan the day before Thanksgiving. Didn't have a seal until New Years. "It ain't just the carpenters and vinyl guys."

Re: Carpenters Handy-work. #116724
04/20/04 07:22 PM
04/20/04 07:22 PM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Cobtronics,
Around here it is the carpenters and vinyl guys, The utility companies in this area don't install service equipment, we install the meter pan, and it takes about 20 minutes for a UG install and about 1-1/2 for an OH install, I can't believe a utility company would leave a hazzard like that, what utility company do you have?


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Posts: 165
Joined: March 2007
Show All Member Profiles 
Top Posters(30 Days)
sparky 23
Admin 19
Potseal 13
Popular Topics(Views)
243,511 Are you busy
180,298 Re: Forum
170,800 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.016s Queries: 14 (0.003s) Memory: 0.9761 MB (Peak: 1.1211 MB) Zlib enabled. Server Time: 2018-01-16 15:24:52 UTC