ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
VDE 0100 to introduce AFCIs
by sparky. 01/16/18 06:36 PM
Air Compressor feeder conductor sizing
by Potseal. 01/15/18 09:08 PM
Under carpet cable?
by HotLine1. 01/15/18 09:57 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 19 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
new work started out wrong #115437
10/29/03 10:51 PM
10/29/03 10:51 PM
Admin  Offline
OP
Administrator
Member
Joined: Oct 2000
Posts: 3,481
NY, USA
[Linked Image]

half inch gal straight thru fire alarm junction box

[Linked Image]

[Linked Image]

(#2 and #3) kindorf and inch and a half conduit on top of pull box

[Linked Image]

a close up of a 1900 box with missing ko, right against the wood wall

-richard

Tools for Electricians:
Re: new work started out wrong #115438
10/30/03 05:49 AM
10/30/03 05:49 AM
I
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Anyone have a code article that shows the top picture is a violation?

Ugly yes but a violation, not to sure.

Even pictures 2 and 3 not sure of what code article would apply here.

Certainly we do not need 3' of work space around this J Box.

Is the box supporting the kindorf?

Then perhaps not using the box as designed may be used.

Don't get me wrong this is ugly work but is it violating the code other than the missing KO.?

What does the building inspector think of the cut off stud for the raceway passing by?


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: new work started out wrong #115439
10/30/03 07:23 AM
10/30/03 07:23 AM
R
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
We have had pictures of pipes through troughs and boxes before.
It would never occur to me to do this.
First of all because it seems extremely unconventional, but it also seems to be a violation of the listing/labeling of the box.
After all, what is the purpose of a junction, or pull box?
Also, how would you determine box fill in deciding if the box is large enough to accomodate the pipe, in addition to the wires?
I know of no volume allowance associated with various pipe sizes.

Re: new work started out wrong #115440
10/30/03 06:25 PM
10/30/03 06:25 PM
richard  Offline
Member
Joined: Aug 2003
Posts: 95
L.I. New York
well, it turns out that the red wires are cat 5, and the box is in the way of some things they want to change, but to rewire is so much of a night mare, that they have decided to work around it. Also, whatever they decide on doing will make it hard to have access to either box.

Re: new work started out wrong #115441
10/30/03 06:44 PM
10/30/03 06:44 PM
P
pwood  Offline
Member
Joined: Feb 2003
Posts: 67
castella,calif usa
building inspector say,
if there is a stud within 24 " of the stud in the corner it is not a problem,otherwise add another stud sistered to the back side of the butchered one.

Re: new work started out wrong #115442
11/02/03 10:43 AM
11/02/03 10:43 AM
P
PCBelarge  Offline
Member
Joined: Jun 2003
Posts: 681
Dobbs Ferry, NY, USA
The raceway through the box although not a usual installation is IMO permissible. I have not found it yet, but there is some language in the code about this very type of installation. Box fill is according to the actual space the pipe occupies.
Why does it always seem that our work winds up in one little corner of these big buildings [Linked Image]?

Pierre


Pierre Belarge

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Radar
Radar
Los Angeles, CA
Posts: 349
Joined: April 2004
Show All Member Profiles 
Top Posters(30 Days)
sparky 23
Admin 20
Potseal 13
Popular Topics(Views)
243,515 Are you busy
180,312 Re: Forum
170,808 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.018s Queries: 14 (0.003s) Memory: 0.9761 MB (Peak: 1.1218 MB) Zlib enabled. Server Time: 2018-01-17 05:10:19 UTC