ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
twh 10
jraef 4
Recent Posts
Correct rotation, wrong sequence
by Potseal. 05/25/17 11:34 PM
Dryer, Range grounding from "Main" panel
by sparkync. 05/25/17 05:49 PM
210.70 / Wall Switch / When adopted?
by gfretwell. 05/24/17 09:18 PM
Any UL 508 experts out there?
by sparkyinak. 05/23/17 11:04 PM
Heat pump conundrum
by sparkyinak. 05/21/17 08:49 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
236,804 Are you busy
171,826 Re: Forum
164,738 Need opinion
Who's Online Now
0 registered members (), 48 guests, and 12 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#113242 - 04/03/02 06:49 PM 2 - 4 - 6 - _ - This We Don't Appreciate!  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,443
NY, USA
[Linked Image]

[Linked Image]
Quote
When doing a site survey in Michigan I ran across the panelboard illustrated in the following photographs. I especially liked the wiring on circuits 2,4 and 6.

Rob Riesner


Tools for Electricians:

#113243 - 04/03/02 07:01 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
Electricmanscott  Offline
Member
Joined: Jan 2002
Posts: 1,457
Holden, MA USA
Yeah, but look at all the space in there!


#113244 - 04/03/02 07:23 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
circuit man  Offline
Member
Joined: Nov 2001
Posts: 273
saluda,s.c.
[Linked Image] wondered if these go to a frame ground? if so someones in for a suprise! [Linked Image] wonder where it goes? any one know?

[This message has been edited by circuit man (edited 04-07-2002).]


#113245 - 04/03/02 07:40 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
CTwireman  Offline
Member
Joined: Feb 2002
Posts: 840
Connecticut, USA
Color codes? What are those?


Peter

#113246 - 04/03/02 08:34 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
HIGHVOLTAGE  Offline
Member
Joined: Feb 2002
Posts: 38
why go out and spend good $$ on red n blue , since i got's all this green left over from st patty's day, heck got's to save the $$$ for memorial day, den we git into the reds n blues, that way i know ,when it was installed, and yup you guessed it um savin those yellow , orange n browns for turkey day,ma panel will look so purty


#113247 - 04/03/02 11:14 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
ZR600  Offline
Member
Joined: Apr 2002
Posts: 46
Stevens Point, WI, USA
I did a job a few years ago at a local college building here in town, and the entire panel located on one floor of the building had green wires on ALL the breakers. Now that was a mess! The first day I had to unwire some walls so they could be taken down boy to my surprise when I found all the grounds in the boxes and they were hot! Must have been a BIG sale on green wire back in the late 1960's here.


#113248 - 04/04/02 08:30 AM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
maintenanceguy  Offline
Member
Joined: Dec 2001
Posts: 300
Southern NJ, USA
Once saw a sub panel in a commercial kitchen. Romex had been pulled through conduit to provide new circuits for some new equipment.

Each wire in each piece or romex went to a breaker.

The black to one breaker, the white to another, and the BARE!!! wire to another breaker(safetly wrapped in tape).

At each outlet, the neutral return path was through the conduit. A piece of white and green wire at box screwed directly to the box.


#113249 - 04/04/02 12:29 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
mamills  Offline
Member
Joined: Nov 2001
Posts: 745
Wharton, Texas, USA
Apart from the green wires connected to the breakers (which is really disturbing and calls into question the competence of the "electrician" who did this) I have seen huge boxes with small circuit breaker frames such as this numerous times in this part of the country. It seems to happen during a service upgrade when an old fuse panel is replaced with circuit breakers. Rather than dig the old box out of the wall and install and fit conduit to a new, smaller box, they remove the obsolete interior and replace it with a new circuit breaker frame, then fabricate some type of cover to dead-front the panel (leaving the old box in place).

Question; Are there any NEC issues for doing this type of thing, and have any of you done this before?

I hate to mention this, too, but if you look closely at the bottom of the breaker frame in the first photo where the main lugs are located, it appears that there are other, much smaller wires double-lugged in there with the big wires (kinda hard to tell with the dead-front in place). Even if there are some type of "auxiliary" lugs under there, it seems that the circuit (and whatever the circuit supplies) has no protection beyond the OCPD which protects the entire panel.

Mike (mamills)

[This message has been edited by mamills (edited 04-04-2002).]


#113250 - 04/04/02 02:22 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
resqcapt19  Offline
Member
Joined: Nov 2000
Posts: 2,148
IL
Mike,
I have installed new guts in old panels on remodel jobs. The installation method was in the specs and new panel manufacturer provided custom covers to mate his panel with the old enclosure.
Don(resqcapt19)

[This message has been edited by resqcapt19 (edited 04-04-2002).]


Don(resqcapt19)

#113251 - 04/15/02 11:12 PM Re: 2 - 4 - 6 - _ - This We Don't Appreciate!  
shortcircuit1  Offline
Junior Member
Joined: Apr 2002
Posts: 5
Effort
Maybe they were color blind..lol
I just got off a school job. THe last Renovation was done about 20 years ago.
Maybe the rules have changed ( LOL )but They used Black Red Blue for the 277 volt and Brown Orange Yellow for the 120 volt.
We were in for a surprise when we went to install our lighting fixtures in a few rooms..OOPS


Page 1 of 2 1 2

Member Spotlight
Potseal
Potseal
Saskatchewan
Posts: 222
Joined: February 2013
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.014s Queries: 15 (0.002s) Memory: 0.8183 MB (Peak: 0.9960 MB) Zlib enabled. Server Time: 2017-05-26 11:16:44 UTC