600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,318 Are you busy
174,785 Re: Forum
167,155 Need opinion
Who's Online Now
1 registered members (NORCAL), 78 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#112688 - 08/18/01 12:53 PM Damage to Cables?  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
www.joetedesco.com

[This message has been edited by Joe Tedesco (edited 04-15-2003).]


Joe Tedesco, NEC Consultant

Tools for Electricians:

#112689 - 08/22/01 09:39 AM Re: Damage to Cables?  
Joe Tedesco  Offline
Member
Joined: Oct 2000
Posts: 2,749
Boston, Massachusetts USA
www.joetedesco.com

[This message has been edited by Joe Tedesco (edited 04-15-2003).]


Joe Tedesco, NEC Consultant

#112690 - 08/22/01 05:28 PM Re: Damage to Cables?  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
George;
I agree, sharp is bad for any raceway, but
I'm not sure of what i'm looking at here, can U explain a bit?


#112691 - 08/22/01 07:32 PM Re: Damage to Cables?  
George Corron  Offline
Member
Joined: May 2001
Posts: 717
Lorton, Va USA
Sorry, the pic can use a bit of explanation. I borrowed the contractors sawzall and cut one of the offending bends about 2" on each side of the coupling,you are looking in the center of the assembly, one side Type EB, one side Sched 40.

We got a letter from NEMA, answered through Carlon. They state that the assembly is designed to fit, but the sched 40 should be reamed to eliminate the sharp edge. Field modifications ???? I thought they were not allowed, but apparently I was wrong about that one. It was not an option here, because it was all together already, so the contractor simply replaced them.



Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,260
Joined: December 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.010s Queries: 14 (0.002s) Memory: 0.7588 MB (Peak: 0.8895 MB) Zlib enabled. Server Time: 2017-07-25 06:33:32 UTC