ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
201 volt equipment?
by bigpapa. 04/29/17 12:15 AM
Schneider LC1D09
by jraef. 04/28/17 11:05 PM
Permit Snafus...AHJs and Contractors Jump in
by sparky. 04/28/17 08:11 PM
Electrode boilers question
by annemarie1. 04/27/17 01:40 PM
Why cables look like they do
by LongRunner. 04/26/17 09:36 AM
New in the Gallery:
SE cable question
Popular Topics(Views)
234,920 Are you busy
169,728 Re: Forum
162,946 Need opinion
Who's Online Now
0 registered members (), 39 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#11254 - 07/06/02 05:01 PM ordering wire  
Eandrew  Offline
Member
Joined: May 2002
Posts: 68
seattle, wa, usa
How much do you add onto your true tape footages for wire orders.

Lets say your pull'n 600's and you got 7 90's (with box in between of course). Do you add 5feet for each nintey and then 10' onto the total footage. whats your method?

One time on the job we were pull'n 600's from basement to roof and the guy on the roof feeding the wire said is it there yet? and the guy at the switchgear said on the radio, no, is it supposed to be???? ( which is was of course) The guy on roof looked like he sh*t his pants.

[This message has been edited by Webmaster (edited 07-06-2002).]


Work Gear for Electricians and the Trades

#11255 - 07/06/02 05:17 PM Re: ordering wire  
The Watt Doctor  Offline
Member
Joined: Dec 2001
Posts: 435
Mont Belvieu, TX
E,
On "big" wire pulls, I always pull in a "measuring" tape (I think Greenlee makes them). I add some for "make up", I also add some for making a "pulling head". Every pull is different. If you have a large switchgear that you are pulling into, the "make up" (or termination, whatever you want to call it) will be more. To me the most important thing is pulling a string or measuring tape into the run of conduit. That way mistakes are less likely to happen.

Wired,
Doc


The Watt Doctor
Altura Cogen
Channelview, TX

#11256 - 07/06/02 05:43 PM Re: ordering wire  
Roger  Offline
Member
Joined: May 2002
Posts: 1,716
N.C.
I do the same thing Doc does. (Yes Doc the norm is greenlee)

When your talking this size wire 6'too moch is better than 6" too short.

But, remember 6'* 4= 24' at somewhere in the nieghborhood of $2.50 - $3.00 a foot, is some noticeable wasted money. Imagine this if you were on a job with 20 - 40 of these runs.

Of course you have to build some waste into your bid.

But once again, 24' of waste on a one time pull is probably more cost effective than what you described. [Linked Image]

Roger


#11257 - 07/06/02 08:41 PM Re: ordering wire  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
I believe Greenlee 435 tape used to have a fairly good "fudge factors" printed on one of the reel faces. They might still be there.

A phone call may pay off… http://www.greenlee.textron.com/support/index.html

Short pulls can surely spoil a Monday.


#11258 - 07/07/02 10:44 AM Re: ordering wire  
golf junkie  Offline
Member
Joined: Apr 2001
Posts: 507
York, NE
I measure off the length of the pull as acurately as possible. I don't add for sweeps. I add the actual length for rise and drops.

Then add for your desired tails or waste needed at each end, ( usually 5-10 ft.).

If I am unable to get an exact measurement I will add a little more to be safe.....just depends on how I feel about it.

I usually don't take the time to push in a fishtape and measure it.....allthough I agree this is the most acurate way.

I haven't been short on a big pull.....yet. I have, however, had times where I expected 10' of drop-off and ended up with less than 1'. [Linked Image]

GJ


#11259 - 07/08/02 06:52 AM Re: ordering wire  
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
The Greenlee measuring tape is invaluable for minimizing waste.
The instructions are:
1. Measure the distance from terminal to terminal.
2. Add 12" for each 90 deg. worth of bend.
3. For each pull box, j-box, or cabinet, add an additional (2 x box depth).

(If you are as wacky as I am, add a little more for peace of mind.)


#11260 - 07/08/02 06:26 PM Re: ordering wire  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
Redsy—I couldn't find that online at their site...would be a handy addition if it's not already there. Only once {fortunately not on my job} have I seen "a sleeve job" on a 1200-foot 4x750-kcmil run. I imagine the compression/heatshrink splices shoehorned a few feet into the duct are fine to his day.


#11261 - 07/09/02 06:39 AM Re: ordering wire  
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
Bjarney,

Go to the Greenlee site (Product info, then Pulling & Fishing)
It's on page 12.

[This message has been edited by Redsy (edited 07-09-2002).]


#11262 - 07/09/02 08:59 AM Re: ordering wire  
Bjarney  Offline
Moderator
Joined: Apr 2002
Posts: 2,527
West-Southern Inner-Northeast ...
10-4 Redsy...thanks.


#11263 - 07/09/02 10:25 PM Re: ordering wire  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,259
Fullerton, CA USA
The formula is also written on the endcap of the reel.
Rojosy's right, add some for "insurance"

[This message has been edited by electure (edited 07-09-2002).]



Member Spotlight
Bill Addiss
Bill Addiss
NY, USA
Posts: 3,878
Joined: October 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.020s Queries: 14 (0.006s) Memory: 0.8097 MB (Peak: 0.9824 MB) Zlib enabled. Server Time: 2017-04-29 07:20:06 UTC