ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by Yooperup. 07/24/17 12:20 PM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,316 Are you busy
174,783 Re: Forum
167,153 Need opinion
Who's Online Now
0 registered members (), 75 guests, and 8 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
Page 1 of 2 1 2
#112230 - 04/29/01 10:10 PM Working Clearances Too  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
[Linked Image]
Submitted by Tom
Quote
Working clearance violation is the least of the problems here. Panel is shown as it was found. The ceiling tile is 10' above finished floor. What is hard to see is what appears to be a black cable at the bottom left corner of the panelboard. It is actually some #8 THHN with a heavy layer of tape that runs into the open end of a conduit just out of sight to the left. I'll leave it to others to spot the rest of the violations.

Tom


Tools for Electricians:

#112231 - 05/01/01 08:48 PM Re: Working Clearances Too  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
man......

as many times as i see these things , it always sets you back stratchin' your head wondering who the guy with the brain tumor was.

is this in a convience store Tom ?

[Linked Image]


#112232 - 05/01/01 10:06 PM Re: Working Clearances Too  
sparky66wv  Offline
Member
Joined: Nov 2000
Posts: 2,236
West Virginia
Please don't tell me that this feeds the gas pumps!


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI

#112233 - 05/01/01 10:39 PM Re: Working Clearances Too  
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,878
NY, USA
Looks like someone recycled a panel here (by the 2 in. ko's) Is that an FPE panel? Can't really make out too many details inside.

Bill


#112234 - 05/01/01 10:44 PM Re: Working Clearances Too  
electure  Offline


Member
Joined: Dec 2000
Posts: 4,260
Fullerton, CA USA
I don't suppose those holes in the top are for ventilation, being that you should get plenty of air by leaving the cover off like that. This is sick looking.


#112235 - 05/02/01 07:23 PM Re: Working Clearances Too  
Tom  Offline
Member
Joined: Jan 2001
Posts: 1,044
Shinnston, WV USA
Lovely, ain't it?

Actually, it is a Square D panel, it is recycled and is located in the social quarters (better known as a bar) of a fraternal organization.

I think we've picked on convenience stores enough for awhile. I wish I had pictures from the local fire department. Myself & 2 volunteer helpers straigtened it out a couple of years ago, I had 46 man hours in it & some of the work was so bad that the above picture looks good in comparison.

Bill, you really don't want to make out too many details on the inside. Typical 2 & 3 conductors in one terminal.

I've got a couple more working clearance pictures & I'll post them next week.

Tom


Few things are harder to put up with than the annoyance of a good example.

#112236 - 05/05/01 09:14 AM Re: Working Clearances Too  
cinkerf  Offline
Member
Joined: Dec 2000
Posts: 84
Pittsburgh, Pennsysvania. ...
I'd like to focus on location of Panelboard. Are panelboards permitted to be located above a suspended ceiling?

Frank (cinkerf)


#112237 - 05/05/01 11:21 AM Re: Working Clearances Too  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
oh oh, Frank wants us to think! [Linked Image] , good call !

ok, 384, nothing

240-24
hmmmmmm , what's the intent here ???? [Linked Image]


#112238 - 05/05/01 06:17 PM Re: Working Clearances Too  
Tom  Offline
Member
Joined: Jan 2001
Posts: 1,044
Shinnston, WV USA
Frank is on the right track. See 380-8(a) This is definitely too high.

240-24 is also a good call, see the definition of readily accessible.

110-12 for the unplugged holes, includes time clock on right.

Working space- the ceiling grid is in the way as is the wall that barely shows in the picture (left side), conduit that is between the panel & time clock, liquidtight flex on left side of panel. 110-26(a)(1), 110-26(a)(2),110-26(a)(3), a case can be made for 110-26(d) and 110-26(f)(1)(a). Whew.

As for the #8's & the tape job to the conduit, 300-10.

Had enuf?

Tom


Few things are harder to put up with than the annoyance of a good example.

#112239 - 05/05/01 06:48 PM Re: Working Clearances Too  
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,311
uncle!


Page 1 of 2 1 2

Member Spotlight
BEAMEUP
BEAMEUP
WA
Posts: 27
Joined: December 2004
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.016s Queries: 15 (0.003s) Memory: 0.8183 MB (Peak: 0.9929 MB) Zlib enabled. Server Time: 2017-07-25 04:32:45 UTC