ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
Potseal 11
Recent Posts
600 KW 120/208 3 Phase Y protection
by SteveFehr. 07/23/17 09:46 AM
1913 American Electrician's Handbook
by gfretwell. 07/20/17 01:08 PM
Green House wiring
by ghost307. 07/20/17 09:10 AM
Permit Snafus...AHJs and Contractors Jump in
by HotLine1. 07/18/17 08:06 PM
New in the Gallery:
SE cable question
Popular Topics(Views)
239,260 Are you busy
174,689 Re: Forum
167,090 Need opinion
Who's Online Now
0 registered members (), 62 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#108528 - 04/02/04 02:24 AM Fire Alarm Horns  
Admin  Offline

Administrator
Member
Joined: Oct 2000
Posts: 3,447
NY, USA
[Linked Image]

[Linked Image]
Quote
Found these at an "Authority" in "Sports" goods store, in a nearby community. Seems like they wanted to guarantee that the horns were visible, and audible, even if they weren't installed quite to Code!

They're run to 1/2" EMT which is bent at an angle to fit it into place, and then was screwed to the shelving rack unit with what appears to be a drywall screw.

- DougW


2017 / 2014 NEC & Related Books and Study Guides

#108529 - 04/02/04 05:25 AM Re: Fire Alarm Horns  
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
We do a lot of warehouse stores and this is how they have us locate the horn strobes also.

Yes we do make a lot on call backs as they do get broken, knocked off and crushed by the forlk lifts.

What are you going to do, in this area you do the Fire Alarm off of stamped and aproved drawings, if we do not follow them we will be back charged (for delay of ocupancy) when the FD inspects and wants the HS where shown. [Linked Image]

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts

#108530 - 04/05/04 12:49 PM Re: Fire Alarm Horns  
FrankC  Offline
Member
Joined: Mar 2004
Posts: 16
San Luis Obispo,CA
The designers and specifiers need to visit the jobsite, or at least follow up on the as built conditions. We had a job where I work that was new construction of a dairy milking parlor. The entire milking and processing area had to be tiled to meet the requirements for hot water(180 deg.)washdown. The engineer specified
smoke detectors in the exit corridors(tiled,of course). Ever try using a smoke detector in a shower?
We got permission to convert the wet locations to 200 deg ROR heat detectors. We also added raintight covers to the signalling devices.



Member Spotlight
electure
electure
Fullerton, CA USA
Posts: 4,260
Joined: December 2000
Show All Member Profiles 
Featured:

2017 NEC and Related
2017 NEC
Now Available!

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.009s Queries: 14 (0.002s) Memory: 0.7532 MB (Peak: 0.8782 MB) Zlib enabled. Server Time: 2017-07-24 00:53:21 UTC